background image

5.

Place roller bag over the

shelter and store away.

4.

Grasp the top and bottom

of diamond on diagonally
opposite sides by “Close”
sticker. Lift the shelter up slight-
ly and shake it while stepping
towards your partner until the
unit is 3/4 closed. With each
partner grasping two outer
legs, push frame together to
fully close it.

Be careful not to pinch fingers.

1.

Locate Zippers and un-

zip roof vent

2.

Release pull pin at each

corner by first lifting valance
fabric away from slider. With
one hand push up on truss near
the pull pin, pull the pin out to
release.

H

OW

T

O

S

ET

U

P

W

HAT

'

S

I

N

T

HE

B

OX

R

OOF

V

ENTS

Note:

Roof vents should be opened in windy conditions or for

ventilation. Both vents should be opened for full effect.

H

OW

T

O

T

AKE

D

OWN

1.

With partner, slightly lift up

two

adjacent

outer

legs,

depress snap button and tele-
scope inner legs into outer
legs. Repeat on the opposite
legs - making sure to do two
legs at a time.

2.

Roll the flap downward.

Finally, attach the toggle
and loop together to secure.

3.

IMPORTANT !

Grasp

each of the four legs one at a
time, shake the trusses up and
down vigorously to overcome
the heavy duty top resistance
to close the frame.

5.

With partner on opposite

side of shelter, stand across from
one another. Grasp the top and
bottom of the diamond shaped
area of trusses on opposite sides
by the “Open” sticker. Lift up and
step backwards

shaking the shel-

ter

until it’s fully opened, being

careful not to pinch fingers.

8.

Lift two adjacent outer legs

up and slide out the inner legs
until the snap button locks into
the outer leg.

Repeat on the

opposite legs - making sure to do
two legs at a time.

6.

To engage the slider at each

corner, first lift the fabric off of the
slider, then with one hand hold
the top of the leg while pushing
up on the slider with the other
hand. The pull pin will engage
the hole. Pull down the fabric
valance over the slider. Repeat on
all four corners.

Trusses

7.

Attach the top to the frame

by matching the quick attach-
ment straps on the top with the
strips on the frame. Pull the cor-
ners down firmly. Push the quick
attachment strips firmly together
at each corner.

Spacers

Fabric Top

Top Attachment Nut

Coin

Open/Close
Truss labels

Roof Vent

Top Attachment Nut

4.*

Unscrew top attachment

nut from bolt. Place top fabric
with grommet over each bolt,
screw on top attachment nut and
tighten until snug. Top should
rotate easily - do not over tighten
the top attachment nut. Repeat
this on opposite end.

* Note: Once top is attached, only perform steps 1 and 5 - 8 to set up.

• 1 10' x 10' Frame Fully Assembled

• 4 Piece Stake Set

• 1 Dura-Last

®

Top

• 1 Roller Bag

Optional Accessories:
• 4 Dura-Lon™ Zippered Sidewalls
• 1 10’ Attached Awning

Note: First Time Top Attachment Is Required.

Top and frame are shipped unattached to avoid damage.
This first time set up takes longer than future set ups. Once
top is attached to frame, set up and take down are easily
accomplished within seconds.

Please read each step before you attempt to set up. Save

these instructions for future reference.

3.*

To secure the top, locate

the two top attachment nuts on
the frame, above the “open and
close” truss labels.

2.*

Gently unfold the fabric

top and place it over the open
frame. Ensure the vents in the
top are located on the adjacent
side to the Open/Close truss
labels. This will ensure correct
orientation of the vents.

1.

Place your E-Z UP

®

frame in

the center of area to be shel-
tered. With partner on opposite
side, grasp two outer legs,
slightly lift off ground and step
backwards, stopping at full arms'
length - approximately 3/4 its
total size.

Pull

Pin

Note:

Custom tops do not include roof vent.

Note:

Custom tops do not include roof vent.

Reviews: