background image

Place your E-Z UP

®

 frame in the center of the area to be 

sheltered.

With partner on the opposite side of the frame, grasp two 

outer 

legs

, lift the frame slightly off the ground, and step backwards 

while pulling the frame to open.

Stop when the frame is approximately 3/4  of its fully-opened size.

Set the frame back on the ground.

ONE-TIME TOP

 INSTALLATION

UNPACK AND OPEN

1

8

8

Vue 

Owner’s Manual

Summary of Contents for VUE

Page 1: ......

Page 2: ......

Page 3: ...and care instructions in this manual If you have any questions or require assistance please contact us at 800 45 SHADE or visit ezup com TABLE OF CONTENTS About Us 4 Important Information 5 Vue 5 x 5...

Page 4: ...development to finished product E Z UP meticulously designs engineers and tests the smallest details of construction and material to ensure years of durable use All of this is supported with extended...

Page 5: ...a temporary shelter Do not leave it up for extended periods Use caution when handling the E Z UP folding frame Avoid pinching hands or fingers as frame opens or closes Do not use shelter in a lightnin...

Page 6: ...PACKAGE CONTENTS FRAME BOX CONTENTS Frame Owner s Manual TOP BOX CONTENTS Fabric Top Cover Bag For Vue 5 x 5 1 5 m x 1 5 m Your shelter is packaged in two boxes 6 6 Vue Owner s Manual...

Page 7: ...tions in this manual Refer to the diagram below for appropriate frame location Vue 5 x 5 1 5 m x 1 5 m PARTS DIAGRAM Outer Leg Weight Bag Stake Kit Attachment Point Toggle Auto Slider Pull Pin Outer T...

Page 8: ...side of the frame grasp two outer legs lift the frame slightly off the ground and step backwards while pulling the frame to open C Stop when the frame is approximately 3 4 of its fully opened size D S...

Page 9: ...the fabric top to the E Z UP frame by matching the hook and loop strips on the inside of the fabric top corners with the hook and loop strips on each frame corner C Pull the fabric top down over the...

Page 10: ...f the diamond shaped area of outer trusses near the OPEN HERE sticker B Lift the frame up slightly and step backwards until the shelter is almost fully opened Gently shake the shelter while opening Be...

Page 11: ...me leg with the other hand The pins will auto engage when aligned with the holes on the frame legs C After the Auto Slider Pull Pin has locked into place pull the fabric top down over the frame leg ma...

Page 12: ...djustment settings on each leg C Repeat on the remaining legs Note It is recommended that you use genuine E Z UP deluxe weight bags and or heavy duty stake kits to secure your Instant Shelter Your E Z...

Page 13: ...he toggle button and slide lower legs into upper legs making sure to do two legs at a time on the same side C Repeat on remaining legs Note Keep the toggle button depressed while retracting leg COLLAP...

Page 14: ...ss near the Auto Slider Pull Pin to relieve pressure B With the other hand release the Auto Slider Pull Pin by pulling the ring C Repeat on remaining legs RELEASE AUTO SLIDER PULL PIN TAKE DOWN Auto S...

Page 15: ...r is approximately 3 4 closed Be careful not to pinch fingers C Grasp the two outer legs and push the frame together until it is fully closed D Store the shelter in the cover bag provided Note Hug you...

Page 16: ...closing or storing to avoid mildew Frame will operate and look better if occasionally treated with silicone spray especially before and after use in damp conditions Remove excess silicone residue befo...

Page 17: ...amination WARRANTY RETURN ADVISORY Before returning any item to INTERNATIONAL E Z UP INC or its designated representative please obtain specific warranty return shipping instructions by submitting a W...

Page 18: ...ESIGN SERVICES From simple text to advance photo quality images we can produce vibrant graphics of any complexity using our advanced printing capabilities Let our expert designers help you create amaz...

Page 19: ...rinters in the world When you need the best Instant Shelter with award winning digital printing rely on the brand recognized by industry experts MORE THAN SHELTERS SO MUCH MORE E Z UP offers so much m...

Page 20: ...International E Z UP Inc Worldwide Corporate Headquarters 1900 Second Street Norco CA 92860 PHONE 800 45 SHADE 951 279 0999 FAX 951 279 0888 ezup com Copyright 2016 International E Z UP Inc...

Reviews:

Related manuals for VUE