When connecting wires to the terminals great care should be 
taken to dress the wires so that when the cover is inserted into 
the  chamber  the  wires  do  not  exert  excess  pressure  on  the 
terminal  blocks.  This  is  particularly  important  when  using 
cables with large cross-sectional areas such as 2.5mm². 
 

Earthing 

 
Both AC and DC sounder units must be connected to an earth 
according  to  EN/IEC  60079/14.  The  units  are  provided  with 
internal and external earth terminals which are both located on 
the terminal chamber section of the unit (see figure 5). 

 

Internal  earthing  connections  should  be  made  to  the  PCB 
terminal block or to the Internal Earth Stud of the housing using 
a  ring  crimp  terminal  to secure  the  earth  conductor  between 
the two M4 stainless steel flat washers. The earth conductor 
should  be  at  least  equal  in  size  and  rating  to  the  incoming 
power conductors. 
 
External earthing connections should be made to the M5 earth 
stud, using a ring crimp terminal to secure the earth conductor 
to  the  earth  stud  between  the  two  M5  stainless  steel  flat 
washers, then reassemble the M5 spring washer and tighten 
the  M5  nut  to  ensure  that  the  cable  lug  is  secured  against 
loosening and twisting. The external earth conductor should be 
at least 4mm

2

 in size. 

 

7.3. Cable Glands, Blanking Elements & Adapters 

 
For  high  ambient  temperatures  the  cable  entry  or  the  cable 
branching point temperatures may exceed: 
 

  70ºC at entry point. 

  80ºC at branching point. 

 

Therefore,  suitable  heat  resisting  cables  and  cable  glands 
must  be  used,  with  a  rated  service  temperature  at  least  as 
stated in the table below: 

 

Max Ambient Temperature (ºC)

 

Model 

40 

45 

50 

55 

60 

65 

70 

GNExS1 

 

70 

75 

80 

85 

90 

95 

Table 2: Min. Ratings of Cables & Cable Glands. 

 

Cable Glands 

 
Appropriate cable glands to be customer supplied. 
 
The cable entries have an M20 x 1.5 

 6H entry thread. Only 

suitably rated and ATEX / IECEx certified cable glands must 
be  used.  They  must  be  suitable  for  the  type  of  cable  being 
used and also meet the requirements of the current installation 
standards EN 60079-14 / IEC60079-14. 
 

Blanking Plugs 
 

When only one cable entry is used the other entries must be 
closed with suitably rated and  certified blanking plugs as per 
type of approval. 
 
Any unused cable entries must be closed with suitably rated 
and ATEX / IECEx certified blanking plugs. 
 

Ingress Protection 

 
If  a  high  IP  (Ingress  Protection)  rating  is  required,  then  a 
suitable sealing washer must be fitted under the cable glands 
or blanking plugs. A minimum ingress protection rating of IP6X 

must  be  maintained  for  installations  in  explosive  dust 
atmospheres. 
 

Adapters 

 
The GNEx sounder range can be supplied with the following 
types of adapters: 

 

M20 to ½” NPT

 

M20 to ¾” NPT

 

M20 to M25 

 

It is important to note that stopping plugs cannot be fitted onto 
adapters, only directly onto the M20 entries. 

 
 

Any  other  adapters  used  must  be  suitably  rated  and  ATEX / 
IECEx certified adapters. 
 
If the installation is made using conduit, openings must have a 
sealing fitting connected as close as practical to the wall of the 
enclosure, but in no case more than the size of the conduit or 
50mm, whichever is the lesser. 
 

8)  Settings 

 
Following illustrations show the settings available for GNExS1 
Alarm Horn Sounders. See schematic diagrams D190-06-001 
for DC units and D190-06-005 for AC units. 
 

8.1. SPL Configuration 

 
See  Table  1  for  product  power  supply  and  Sound  Pressure 
Levels (SPL). 
 

Configuration for DC Units 

 

 

Figure 6: DC PCBA SPL Configuration.

 

 

Configuration for AC Units 

 

 

Figure 7: AC PCBA SPL Configuration.

 

 
 

Summary of Contents for GNExS1R Series

Page 1: ...c 50 60Hz 73mA 80mA 110 105 230Vac 48mA GNExS1FDC024 12Vdc 10 30Vdc 221mA 221mA 115 110 24Vdc 185mA GNExS1FDC048 48Vdc 38 60Vdc 115mA 221mA 115 110 GNExS1FAC230 115Vac 100 260Vac 50 60Hz 73mA 80mA 115 110 230Vac 48mA Max Tone 4 Nom Tone 44 The table shows the input current taken by the various sounders A supply voltage variation of 10 outside the voltage range is permissible The current levels sho...

Page 2: ...Classification The units can be installed in locations with the following conditions Area Classification Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas air mixture not likely to occur in normal operation and if it does it will only exist for a short time Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC Hydrogen and Acetylene Temperature Classi...

Page 3: ...ible between the cover and base of the sounder enclosure Tighten the M3 grub screw 7 Installation Requirements 7 1 Installation Standards Compliance Warning High voltage may be present risk of electric shock DO NOT open when energised disconnect power before opening The sounder must only be installed by suitably qualified personnel in accordance with the latest issues of the relevant standards ATE...

Page 4: ...ed in the table below Max Ambient Temperature ºC Model 40 45 50 55 60 65 70 GNExS1 70 75 80 85 90 95 Table 2 Min Ratings of Cables Cable Glands Cable Glands Appropriate cable glands to be customer supplied The cable entries have an M20 x 1 5 6H entry thread Only suitably rated and ATEX IECEx certified cable glands must be used They must be suitable for the type of cable being used and also meet th...

Page 5: ...nt tones that can be selected independently for the first and second stage alarms The tones are selected by operation of the tone setting DIP switch 1 DIP 2witch 2 see figures 6 and 7 on the PCB for stage 1 and stage 2 respectively Default S2 Tone 1 Default S1 Tone 44 ON 1 OFF 0 Figure 9 DIP switch configuration The sounder can also be switched to sound the third and fourth stage alarm tones The t...

Page 6: ... 06 005 for AC schematic diagrams 7a AC Single Stage Configuration Default 7b AC Three Four Stage Configuration Default 8 AC Two Stage Voltage Free Activation Configuration Custom K Table 3 Summary of Wiring Options 9 End of Line Monitoring DC Units All DC units have a blocking diode fitted in their supply input lines An end of line monitoring diode or an end of line monitoring resistor can be con...

Page 7: ...vant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance Flameproof threaded joints and cemented joints are not permitted to be repaired Units must not be opened while an explosive atmosphere is present If opening the unit during maintenance operations a cl...

Page 8: ...E MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120Ω MIN 2W MIN OR 1KΩ MIN 0 5W MIN 28V MAX SYSTEM 470Ω MIN 2W MIN OR 2 4KΩ MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT Common ve IN Common ve OUT Stage 2 ve Stage 1 ve IN Stage 1 ve OUT Common ve IN Common ve OUT Stage 2 ve Stage 3 ve R1 R1 S2 R1 S2 S3 Stage 1 ve IN Stage 1 ve OUT Stage 1 ve IN Stage 1 ve OUT Singl...

Page 9: ...ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120Ω MIN 2W MIN OR 1KΩ MIN 0 5W MIN 28V MAX SYSTEM 470Ω MIN 2W MIN OR 2 4KΩ MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Set H1 H2 to ve switching Three Four Stages Voltage Free 2nd 3rd 4th Stage Activation Config...

Page 10: ...e 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage 2 Cconnect Stage 2 ve to Common ve Stage 3 Connect both Stage 1 ve Stage 2 ve to Common ve CUSTOM CONFIGURATION CONTACT E2S WHEN ORDERING Cut Link W1 H2 H1 Set H1 H2 to ve switching CUSTOM CONFIGURATION CONTACT...

Page 11: ...S RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E N N L L E C N N L L E C S2 S3 Live IN Live OUT Neutral IN Neutral OUT Stage 1 Live IN Stage 1 Live OUT Stage 1 Neutral IN Stage 1 Neutral OUT Single Stage Configuration Config 1a Stage 1 Apply Power to S...

Page 12: ... 0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0 1 0 0 1 1 0 1 0 1 1 1 0 1 0 1 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 1 1 0 0 0 1 0 0 1 0 0 1 1 0 1 0 0 1 0 1 1 0 0 1 1 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 1 0...

Page 13: ...dy No 2813 CSA Group Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIB or IIC T3 T4 T5 or T6 Gb Standards applied EN 60079 0 2018 EN 60079 1 2014 A C 2018 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6 1 2007 EN 61000 6 2 2005 EN 6...

Page 14: ...ate and Place of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of the m...

Reviews: