16
1) Plug the logger to the Wifi port on the inverter
2) Rotate the front operative part of the stick clockwise till the secure
connection of the stick
More detailed information about communications can be found in
corresponding manuals.
5.4.2 Communications of BMS, Meter, DRM, Inverters Parallel, and RS485
5.5.2 Battery Communications :
The communications between the inverter and battery BMS, meters &
DRM, RS485 and parallel inverters is explained below.
Connector Assemble Procedures:
1) Strip the insulation layer off the communications sable for a little
length.
2) Insert the wire into the Crimp Contact and crimp them with an
electrical crimp-er.
3) Thread the communications cable through Nut, Seal Ring, and
Housing successively, and insert the cable into the corresponding pin of
the Terminal (Function of corresponding pin will be introduced below).