Installation, Operation and Parts Manual
EE-6215EKZ
15
Step
8:
Connect
oil
hoses.
1.
Install
hydraulic
power
unit
onto
the
main
post.
2.
Connect
oil
hoses
(NO.4
and
5
in
the
below
Fig.)
to
the
“T”
connector
in
the
main
post.
NOTE:
make
sure
the
connectors
and
hose
are
clean.
1.
Anti
‐
vibration
washer
2.
Hex
head
nut
M10
3.
Spring
washer
M10
4.
Flat
washer
M10
5.
Hex
head
full
swivel
screw
M10*35
1.
Composite
connector
2.
Rubber
oil
hose
3.
“T”
connector
4.
Short
oil
hose
5.
Long
oil
hose
6.
Oil
cylinder
7.
Hydraulic
power
unit