Installation, Operation and Parts Manual
EE-6435V2.B.PD
15
INSTALLATION
INSTRUCTIONS
4.1
Preparations
before
installation
4.1.1
Space
requirements.
Refer
to
3.3
for
the
dimensions
of
the
lift.
There
must
also
be
a
clearance
of
at
least
0.6m
between
the
lifting
platform
and
fixed
elements
(e.g.
wall)
in
all
lifting
positions.
There
must
be
sufficient
space
at
the
ends
of
the
lifting
platform
for
driving
vehicles
on
and
off.
To
stop
vehicles
colliding
with
the
ceiling,
it
is
advisable
to
fit
an
overhead
light
barrier
in
low
ceiling
buildings.
4.1.2
Foundations
and
connections
The
user
must
have
the
following
work
performed
before
erecting
the
lift.
Construction
of
the
foundation
following
consultation
with
the
manufacturer’s
customer
service
or
an
authorized
service
agent.
Routing
of
the
wiring
to
the
installation
location.
The
user
must
provide
fuse
protection
for
the
connection.
Requirements
for
power
supply
cable
of
the
installation
site:
at
least
2.5mm
2
wire
core
for
3Ph
power
and
4.0mm
2
wire
core
for
1Ph
power.
Attention:
electrical
system
connection
must
be
done
by
licensed
technicians.
Refer
also
to
the
corresponding
information
on
the
name
plate
and
in
the
operation
instructions.
Before
doing
electrical
connection,
make
sure
the
lift
is
electrically
adapt
to
the
local
power
supply.
Summary of Contents for EE-6435V2.B.PD
Page 30: ...Installation Operation and Parts Manual EE 6435V2 B PD 30 Annex 1 Steel cable connection...
Page 36: ...Installation Operation and Parts Manual EE 6435V2 B PD 36...
Page 37: ...Installation Operation and Parts Manual EE 6435V2 B PD 37...
Page 38: ...Installation Operation and Parts Manual EE 6435V2 B PD 38...
Page 39: ...Installation Operation and Parts Manual EE 6435V2 B PD 39...
Page 40: ...Installation Operation and Parts Manual EE 6435V2 B PD 40...
Page 41: ...Installation Operation and Parts Manual EE 6435V2 B PD 41...