Installation, Operation and Parts Manual
EE-6435V2.B.PD
21
Secondly,
level
the
platforms
after
mechanical
safety
locks
are
engaged.
Raise
the
platform
about
750mm
‐
800mm
high
and
check
if
the
safety
blocks
in
the
four
posts
could
be
engage
synchronously.
If
not,
adjust
screw
①
to
ensure
the
synchronization.
Step
12:
Adjust
limit
switches
for
out
of
level
protection
system.
Make
the
platform
be
locked
at
height
of
800mm
and
adjust
the
limit
switch
as
showed
in
the
following
drawing
with
hex
socket
spanner
(3mm)
Step
13:
Fix
the
expansion
bolts
Refer
to
3.3
and
adjust
the
distance
between
posts
before
drilling
holes
for
expansion
bolts.
1.
Drill
anchor
holes
for
expansion
bolts
on
the
installation
foundation
with
an
electrical
drill.
Make
sure
to
drill
vertically.
2.
Remove
thoroughly
the
debris
and
dust
in
holes
and
ascertain
that
the
posts
stay
right
upon
the
circle
previously
marked
by
chalk.
3.
Hammer
in
and
secure
expansion
bolts.
Summary of Contents for EE-6435V2.B.PD
Page 30: ...Installation Operation and Parts Manual EE 6435V2 B PD 30 Annex 1 Steel cable connection...
Page 36: ...Installation Operation and Parts Manual EE 6435V2 B PD 36...
Page 37: ...Installation Operation and Parts Manual EE 6435V2 B PD 37...
Page 38: ...Installation Operation and Parts Manual EE 6435V2 B PD 38...
Page 39: ...Installation Operation and Parts Manual EE 6435V2 B PD 39...
Page 40: ...Installation Operation and Parts Manual EE 6435V2 B PD 40...
Page 41: ...Installation Operation and Parts Manual EE 6435V2 B PD 41...