Installation, Operation and Parts Manual
EE-6435V2.S/EE-6435V2.B
24
5.2 Descriptions of control panel
5.3 Flow chart for operation
POS.
Name
Function
FA
Alarm buzzer
Low height warning
QS
Power switch
Power on/ off
HL
Power indicator
Display if electricity is connected
SB1
UP button
Control the rising movement
SB3
DOWN I button
Control the initial lowering movement
SB2
Safety lock /DOWN II button
1.1 In case the clearance between the platform and
the floor is more than 300mm, press DOWN II
button to lock the platform.
1.2 In case the clearance between the platform and
the floor is less than 300mm, press DOWN II, the
platform will continue lowering to the lowest
position and alarm buzz will be heard.
SB4
Reset button
As the lift is equipped with ‘out of level protection
system’, in case the steel cable s are not properly
adjusted, UP and DOWN button will lose its control
function. In this case the operator can push this
button and DOWN button to lower the platform in
emergency conditions.
SB
Emergency stop
Ensure quick stop in emergency situations
Summary of Contents for EE-6435V2.B
Page 31: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 31...
Page 32: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 32...
Page 33: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 33...
Page 38: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 38...
Page 45: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 45...
Page 48: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 48...
Page 51: ......