Installation, Operation and Parts Manual
EE-6501V2
16
Step
5:
Connect
the
electrical
system.
Requirements
for
power
supply
cable
of
the
installation
site:
at
least
2.5mm
2
wire
core
for
3Ph
power
and
4.0mm
2
wire
core
for
1Ph
power.
Refer
to
Annex
1
when
fix
the
electrical
system.
Connect
the
wire
connectors
for
rising
and
lowering
limit
switches
Connect
the
power
suppler
cable
to
external
electricity
supply.
(For
three
phase
power
supply
,if
the
lift
doesn't
raise
and
the
motor
may
turn
in
the
wrong
direction,
in
such
event,
interchange
wires
U,
V
in
the
control
cabinet)
.
Step
6:
Connect
the
pneumatic
release
system.
Screw
torque
for
connector
is
20N*M.
Connect
air
hoses
as
per
the
following
fig.
External
compressed
air
shall
be
prepared
by
the
end
user
before
installation.
Pneumatic
pressure
6
kg/cm²
‐
8kg/cm²
Summary of Contents for EE-6501V2
Page 10: ...Installation Operation and Parts Manual EE 6501V2 10 3 3 Dimensions Unit mm...
Page 27: ...Installation Operation and Parts Manual EE 6501V2 27 Annex1 Wiring diagrams and parts list...
Page 28: ...Installation Operation and Parts Manual EE 6501V2 28...
Page 29: ...Installation Operation and Parts Manual EE 6501V2 29...
Page 33: ...Installation Operation and Parts Manual EE 6501V2 33...
Page 37: ...Installation Operation and Parts Manual EE 6501V2 37...