Installation, Operation and Parts Manual
EE-6501V2
18
A.5.
In
case
they
do
not
lower
synchronously,
open
the
valve
that
controls
the
slower
‐
lowering
platform
and
press
DWON
I
button
to
have
them
lowered
to
the
lowest
position
and
then
close
the
leveling
valve.
If
the
lift
is
equipped
with
a
height
limit
switch,
press
DOWN
II
button
when
platforms
stop
lowering
at
a
safety
height
from
the
ground.
A.6.
After
both
leveling
valves
having
been
closed,
press
the
UP
button
to
check
if
both
platforms
rise
synchronously.
A.7.
Repeat
doing
step
A5
and
step
A
6
until
synchronization
achieved.
Step
9:
Fix
base
frames
with
expansion
bolts.
1.
Adjust
the
distance
between
the
two
lifting
platforms
and
mark
the
points
for
each
anchoring
bolt.
2.
Drill
anchor
holes
with
an
electrical
drill.
Make
sure
to
drill
vertically.
3.
Remove
thoroughly
the
debris
and
dust
in
holes
and
hammer
in
and
secure
with
expansion
bolts.
Step
10:
Fix
oil
hose
protection
covers.
Summary of Contents for EE-6501V2
Page 10: ...Installation Operation and Parts Manual EE 6501V2 10 3 3 Dimensions Unit mm...
Page 27: ...Installation Operation and Parts Manual EE 6501V2 27 Annex1 Wiring diagrams and parts list...
Page 28: ...Installation Operation and Parts Manual EE 6501V2 28...
Page 29: ...Installation Operation and Parts Manual EE 6501V2 29...
Page 33: ...Installation Operation and Parts Manual EE 6501V2 33...
Page 37: ...Installation Operation and Parts Manual EE 6501V2 37...