Installation, Operation and Parts Manual
EE-6501V2
19
4.4
Items
to
be
checked
after
installation.
S/N
Check
items
YES
NO
1
Screw
torque
of
expansion
bolts
:
60
‐
80N•m;
2
Rising
speed
≥
20mm/s;
3
Noise
with
rated
load
≤
75db;
4
Grounding
resistance:
not
bigger
than
4
Ω
;
5
Height
difference
of
the
two
platform
≤
5mm;
6
Mechanical
locks
are
robust
and
synchronized
when
running
with
rated
load
;
7
If
the
control
button
works
as
“hold
to
run”?
8
If
limit
switches
work
well?
9
If
grounding
wire
is
connected?
10
If
rising
and
lowering
smoothly?
11
If
there
is
no
abnormal
notice
during
running
with
rated
load?
12
If
there
is
no
oil
leakage
when
running
with
rated
load?
13
If
there
is
no
air
leakage
when
running
with
rated
load?
14
If
expansion
bolts,
nuts
or
circlips
is
well
secured?
15
If
max
lifting
height
is
1850mm?
16
If
Safety
advices,
name
plate
and
logos
are
clear?
OPERATION
INSTRUCTIONS
5.1
Precautions
5.1.1
Check
all
connections
of
oil
hose.
Only
when
there
is
no
leakage,
the
lift
can
start
work.
5.1.2
The
lift,
if
its
safety
device
malfunctions,
shall
not
be
used.
5.1.3
It
shall
not
lift
or
lower
an
automobile
if
its
center
of
gravity
is
not
positioned
midw
ay
of
the
runways.
Otherwise,
we
as
well
as
our
dealers
will
not
bear
any
responsibility
for
any
consequence
resulted
thereby.
5.1.4
Operators
and
other
personnel
concerned
should
stand
in
a
safety
area
during
lifting
and
lowering
process.
5.1.5
When
runways
being
raised
to
the
desired
height,
switch
off
the
power
at
once
to
lock
the
button
with
a
padlock
to
prevent
any
wrong
operation
done
by
unconcerned
people.
5.1.6
Make
sure
the
safety
lock
of
the
lift
is
engaged
before
start
working
under
the
vehicle
and
no
people
under
the
vehicle
during
lifting
and
lowering
process.
Summary of Contents for EE-6501V2
Page 10: ...Installation Operation and Parts Manual EE 6501V2 10 3 3 Dimensions Unit mm...
Page 27: ...Installation Operation and Parts Manual EE 6501V2 27 Annex1 Wiring diagrams and parts list...
Page 28: ...Installation Operation and Parts Manual EE 6501V2 28...
Page 29: ...Installation Operation and Parts Manual EE 6501V2 29...
Page 33: ...Installation Operation and Parts Manual EE 6501V2 33...
Page 37: ...Installation Operation and Parts Manual EE 6501V2 37...