Installation, Operation and Parts Manual
EE62C-35T-E / EE62C-42T-E
21
Step 14: Trial running.
Get familiar with lift controls by running the lift through a few cycles before loading vehicle on lift.
This step is of particular
importance for it can check if the oil hose is well connected. The connection is qualified when there is no abnormal sound or leakage
after having been tested for 5-6 times.
Vent air remained the oil cylinder. Screw loose the nut on top of the oil cylinder and slightly press the UP button until oil gets out.
Screw the nut tight thereafter.
Check the mechanical safety locking system
Check if mechanical locks can be well engaged or released in the running process. Adjust by screwing the screw as showed in the
following drawing in case the locks do not work well.
Check the synchronization of lifting carriages.
Ensure the synchronization by adjusting the steel cables at both sides. Make both cables be of the same tension.
This could be judged by the sound emitted by the safety locking unit during lifting process.
If the lift doesn't raise, the motor may turn in the wrong direction. In such event, interchange wires U, V in the connection box.
Step 15: Fix the two covering sheets and two covers for electromagnets.
1.Hex nut M6
2.Flat washer M6
3.Hook
3.Covering sheet
5.Flat washer M6
6.Cross socket cap head screw M6*8
1.Hex socket screw M6*12
2. Cover
Vent air remained in the cylinder