Installation, Operation and Parts Manual
EE62C-35T-E / EE62C-42T-E
26
MAINTENANCE
Following are requirements for routine maintenance. Easy and low cost routine maintenance can ensure the lift work normally and
safely. Frequency of routine maintenance is determined by working condition and frequency.
S/N
Components
Methods
Period
1
Swing arm locking units
Push the UP button to raise the lifting arms and check if four swing
arms are locked into position. Add grease in case necessary.
Every day
2
Rubber contact pads
Inspect the pads and clean off any objects that may cause sliding or
damage
Every day
3
Cylinder and oil hose
connectors
Inspect to ensure no leakage before using the lift.
Every day
4
Control buttons
Check if control buttons work as "hold- to -run " and check if they
work as the function indicated.
Every day
5
Mechanical safety catch
Check if both mechanical catches can engage and disengage
simultaneously by pushing control buttons.
Every day
6
Limit switch
Push the UP button and inspect and to ensure the lifting platform
stops rising when the switch is activated.
Every day