background image

3

SET  UP THE GREENHOUSE

Step 5

VELCRO CONNECTION

Velcro

Velcro

● 

Secure the PE top to the legs of the frame using the Velcro connections.

Summary of Contents for Foldable Greenhouse Canopy

Page 1: ...Eagle Peak 8 ft x 8 ft Foldable Greenhouse Canopy INSTRUCTION MANUAL Thank you for choosing Eagle Peak ...

Page 2: ...l be limited to 1 Year from the date of original purchase This warranty does not cover any product purchased through non authorized dealers and or online auction websites This warranty shall be void as to any product which has been altered or modified in any manner Global Shade Corporation does not warrant against and under no circumstances shall Global Shade Corporation be liable or responsible f...

Page 3: ...TOP Lift and partially pull the frame apart Unfold the PE top unzip the door and place on top of the canopy frame Avoid the peak cap hooking the lining of the PE top Secure the PE top to the corners of the canopy frame using Velcro connections Unzip OPTION 1 Velcro ...

Page 4: ...g the plastic tabs on each corner of the top of the frame and pushing the leg sliders up until it clicks into the locked position LOCK THE FRAME ADJUST THE GREENHOUSE HEIGHT Press the push button on each leg and raise or lower to adjust the greenhouse height Click ...

Page 5: ...3 SET UP THE GREENHOUSE Step 5 VELCRO CONNECTION Velcro Velcro Secure the PE top to the legs of the frame using the Velcro connections ...

Page 6: ...py leg Insert stakes into the loops at bottom of sidewall Tie four ropes to the corners of the top fabric Measure out from the each leg to a proper distance and secure four stakes to the ground Tie the ropes to the stakes in the ground Ensure the rope has the proper tension by adjusting the plastic adjusters on the ropes X6 loop loop ...

Page 7: ...ROLL UP THE DOOR AND THE CURTAIN Roll up the door and the curtains if necessary Hang flower pots on the hooks if necessary Maximum weight capacity 20 lbs 5 SET UP THE GREENHOUSE Step 7 ...

Page 8: ... Secure the canopy top to the corners of the canopy frame using the Velcro connections Step 3 LOCK AND ADJUST Lock the frame by holding the plastic tabs on each corner of the top of the frame and pushing the leg sliders up until it clicks into the locked position Press the push button on each leg and raise or lower to adjust the canopy height 6 Click Velcro ...

Page 9: ...7 TAKE DOWN THE GREENHOUSE Pull up all stakes from the ground Press the push button on each leg and retract the legs to their original height Press the push button on each slider to unlock the frame ...

Page 10: ... 14 10 Part Description 1 Ceiling Assembly Peak Cap 10 Leg Assembly 5 6 Eave Assembly 7 12 13 11 Stake Rope 14 Carry Bag Canopy Top Greenhouse Top With Sidewalls 1 6 7 5 To inquire about replacement parts please contact Eagle Peak through the website ...

Page 11: ......

Page 12: ......

Reviews: