background image

7

TAKE DOWN THE CANOPY

Step 8

 Pull up all stakes from the ground. 

 Press the push button on each leg and retract the legs to their original height.

 Get underneath the canopy.Rotate/twist the center hub counterclockwise to unlock the frame.

 Take off the PE top, lift one corner of the frame until all legs are raised off the ground except 

     for the 1 leg on the opposite corner. Push inward until the frame is fully closed.  

Summary of Contents for GH48EPT-GRN-AZ

Page 1: ...ut Series w Easy Peak Single Person Setup Item GH48EPT GRN AZ INSTRUCTION MANUAL Do not return your canopy to the place of purchase For warranty service repair parts or product questions please email...

Page 2: ...through non authorized dealers and or online auction websites This warranty shall be void as to any product which has been altered or modified in any manner Global Shade Corporation does not warrant a...

Page 3: ...1 PACKING INCLUDES Hardware A Canopy Frame 1pc B Canopy Top With Sidewalls 1pc AA Stake 10pcs BB Spiral Stake 4pcs CC Rope 4pcs Part List...

Page 4: ...CANOPY TOP Lift and partially pull the canopy frame apart Unfold the canopy top unzip the door and place on top of the canopy frame Avoid the peak cap hooking the lining of the canopy top Secure the...

Page 5: ...rom under the canopy use one hand to push the central bottom hub straight up until it clicks into the central pole LOCKING THE FRAME ADJUSTING THE CANOPY HEIGHT Press the push button on each leg and r...

Page 6: ...ANOPY Step 5 VELCRO CONNECTION Velcro Velcro Secure the canopy top to the corners of the canopy frame using the Velcro connections Secure the canopy top to the legs of the canopy frame using the Velcr...

Page 7: ...of each canopy leg Insert stakes into the loops at bottom of sidewall Tie four ropes to the corners of the top fabric Measure out from the each leg to a proper distance and secure four stakes to the...

Page 8: ...ROLLING UP THE DOOR AND THE CURTAIN Roll up the door and the curtains if necessary 6 SET UP THE CANOPY Step 7...

Page 9: ...act the legs to their original height Get underneath the canopy Rotate twist the center hub counterclockwise to unlock the frame Take off the PE top lift one corner of the frame until all legs are rai...

Page 10: ...ing Assembly 2 Central Bottom Hub 9 Peak Ceiling Assembly 3 Top Cap 10 Left Leg Assembly Right Leg Assembly 4 Left Top bracket 5 Left Slider Right Top bracket Right Slider 6 Entry Sider Eave Assembly...

Page 11: ......

Page 12: ......

Reviews: