9
AVI Slide Rev - C
Concrete P
ad or Mount P
ost Installation
Concrete Pad Installation
Post Mount Installation
POW
ERE
D B
Y
EA
GL
E
AV
I
Run any 1/2”
conduit
needed for the
installation.
Recommended dimensions
5” min above ground.
19”
24”
18”
pipe d
epth
in concrete
recommended
.
18” Min
Above
Grou
nd
24”
Below ground depth of the
concrete pad is determined
by soil conditions and local
building codes (reinfor
ced
concrete recommended).
Drill holes in 2” ID pipes
that match holes on
plate’s pipes and secure
with bolts.
1/2”
Conduit
Holes
POW
ERE
D B
Y E
AGL
E
AV
I
Bolt
2” Inside Dia. Pipe
Not provided
1/2” x 3 1/2”
Sleeve anchors
(Not provided)
Eagle Post Mount Sold Separately
Eagle Part Number: EG099
Summary of Contents for AVI
Page 2: ...2 AVI Slide Rev C ...
Page 23: ...21 AVI Slide Rev C NOTES ...