background image

Summary of Contents for TPO-9

Page 1: ...TP0 9 TP0 9A MX 9A 9000LBS CLEAR FLOOR ASSYMETRIC LIFTS INSTALLATION AND OPERATION MANUAL DATE INSTALLED _ _ _ _ __ SERIAL _ _ _ _ _ __ EAGLE...

Page 2: ...J INSTALLATION AND OPERATION MANUAL MODEL TP0 9 TPO s A MIN POST LIFTS h lll 1 i i 11 r ll fl 11 It 11 1 II i T 0 3f i PO S 1 ti Fer technical support or service cau eao _535 0016...

Page 3: ...4 ITelescoping arms 1 I Overhead beam In Parts Box I 1 r 7i hose 1 I ti hos 0 4 Arm pivot prns 4 1Truck adaoter I 4 l Scinwos 12 I Anchor batts 1 i Catalca 1 i Smat parts b sg _ Small Parts 8aa ii16 w...

Page 4: ...s ar c install tap team Step 4 Step 5 Step 6 Step 7 Step 9 Step 10 Operation lnstail anchor bolts and re eve c umns lr stail and adjust cables Install power unit hoses and cut cff cable lns al arms In...

Page 5: ...f the vehicle only Dor ct attempt ta ift cr iy art of the vehic e lmprc sr use of t his Ci i msr t c Ju d resuit in cat 1age to the ift yaursalf er ether praparty The iift is 1ntsr ce tc lift vehic es...

Page 6: ...t of the shop Now snap a chalk line between the two marks this is the csr tsr line fer your lift Measure 71 TP0 9A or68 TP0 9 from the center line to each s ce cf the csnte Hne atfront 21 t r r of th...

Page 7: ...deer snap hcrizantal chalk line as shown Use square and measure 12 from gen sid f previous chalk line on each side and snap horizontal chalk line as shewn WORKBENCH cmm R LINS 1 1 c I Ui E T SHCFARE G...

Page 8: ...and the column up and assemble the nipple and the elbow fitting into the rear facing port using Teflon tape Se sure the elbow fitting is facing up when tight see Figure 3 Repeat this process far the o...

Page 9: ...n Figure 4 We rec l 7 imend placing the power unit on the passanger sfda far ease of operation lnstail the uprights so the threaded rod at ths tcp face each other the thrsaded rads should facs the cen...

Page 10: ...a keep the columns even en the basalina The outer c1mensions are not as import nt ct this pafnt Check tcp fer space between the upright and top beam You shoulc haVe less than between If you have rncra...

Page 11: ...1t n g t i 1 n a 11 cit ic a thQ c I 1c JL 1 lll i 1 1oi 4 v1 t i L 1 1 u 1 _ i_ leve as you can et yc J Nill hsve a geed solid instai ation am yaars c tr u e free ssrvica Step S lnstaH and adjust cab...

Page 12: ...ght side and running it ever the back pufleys with beth cables in placs you ars ready to adjust Start on the left sic s With a pair of vice grips grab the t iqttam of the shai where thrsads are pcinti...

Page 13: ...itting found in the parts ex Screw in the T until the 0 ring touches the pump and the ends ara fac r g tr e tcp cf he motor and the bottom cf the tank Then use an 11 16 wrer c i tc tighten t 1e tockin...

Page 14: ...they are tight to avoid leaks Attach the 1 16 cable tc the flat washer at the tao cf the left srde uoricht usir c I W the small aluminum fern iies Loop the cable thrm h the ferrule tnen through the w...

Page 15: ...Installation Manual TP0 9 TP0 9A TYPICAL SWING ARM INSTALLATION FIGURE 78 0 T 0 9 TP 14 II i 1 1 11 I r n i If I I 11 1 II it II r 1 Ii I I I I 1 11 11 ri 711 l t 1 l I POWE...

Page 16: ...1 2 2 11 MIN J _ 3 21 MIM t filIE MIN MAX DIMENSIONS FOR RtCTANCULAR LIFT POINTS E E ll WICCS 11mNH w I AJIIH 11 1 J_A G L uliAWSn TONY WARMACK I irL t t1n1ufucl u_ring Coq1 r 12 t8 0 qsirnn 1 1 8l 5...

Reviews: