Step 9.
Check ACU. Check each port of rear panel connection.
Front Panel of ACU
Rear Panel of ACU
USB port,for
upgrading
firmware of ACU
and debug
Indicators, show
antenna
running status
256x64 OLED display,
shows all status and
setting of antenna
Connect to Modem
& other IP device
Connect to Modem
Console
Connect to Modem
Connect to
Antenna(ADU)
Ground Stud, must be well
Grounding. For safety and ESD
protection.
Buttons for ACU operation
Preparation for Installation
Part-2 ACU and Modem (BDU Preparation)
15
www.eardatek.com