background image

5

Fireplace Installation

Earthcore reserves the right to make changes at any time without notice in design, materials and specifications. Earthcore further  

reserves the right to discontinue styles and products. Please call 1-800-642-2920 for an Isokern dealer near you.

Mortar All

Components

A

A - Base Plate 

B - Side Wall

B

C

D

F

E

G

H

I

C - Back Wall

D - Damper Beam

E - Damper End

F - Smoke Dome

G - Top Sloping

H - Top Plate

I - EM40 Mono Block

** Number of Components

May Vary with Different Kit

Sizes

Typical 4” Reinforced 

Concrete Slab

Note:

The system should be built 

upon a non-combustible 

concrete slab with no wood 

underpinnings designed to carry 

the total weight of the Isokern 

Fireplace and Chimney System.

The DM 54 Dual Module 

Chimney System can also be 

used on an outdoor Isokern 

fireplace.

Summary of Contents for ISOKERN Standard 36

Page 1: ...log appliance used in this product be installed in strict accordance with NFPA 58 NFPA 54 ANSI Z223 1 and the gas log manufacturer s explicit installation sizing and operation instructions It is the r...

Page 2: ...intenance Information 11 Warranty Note Illustrations shown in this manual are not to scale and are intended to show typical installations Nominal dimensions are given for design and framing reference...

Page 3: ...8 36 42 48 60 72 Standard Series 36 42 46 All units have either a 30 Finished opening height Standard Series or a 36 finished opening height Magnum Series The EM 40 chimney system is a single module r...

Page 4: ...31 19 3 4 60 1 4 28 1 2 WEIGHT 1040 lbs 1300 lbs 1420 lbs 1600 lbs 28 Model comes with three 3 sidewalls MAGNUM SERIES 60 72 28 28 38 38 69 3 4 57 1 4 85 1 2 73 1 2 85 3 4 85 3 4 69 55 1 2 65 1 2 81...

Page 5: ...A Base Plate B Side Wall B C D F E G H I C Back Wall D Damper Beam E Damper End F Smoke Dome G Top Sloping H Top Plate I EM40 Mono Block Number of Components May Vary with Different Kit Sizes Typical...

Page 6: ...uld also be considered Hint Before application wet down the surface area then apply water dipped firebrick for improved adherence All required through wall accesses gas and electrical line feeds and c...

Page 7: ...eel L support used in the masonry veneer around the front of the unit behind the veneer facing Any proposed brick stone or other masonry veneer facing must have sufficient foundation to support the fu...

Page 8: ...sided unit components by eliminating the back wall assembly In this installation the firebox side wall components are reversed so that the side wall taper sits to the outside of the box leaving the i...

Page 9: ...is activity must be avoided It is the responsibility of the building contractor to insure that the required dry in period is met and that the required lighting sequence is performed by the owner or by...

Page 10: ...he heating season Inspect the flue periodically during the heating season for the presence of soot and creosote build up If creosote or soot has accumulated it should be removed to reduce the risk of...

Page 11: ...Notes Maintenance Information 11...

Page 12: ...sion thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components Earthcore is not responsible for misuse or mishandling of components Nothing...

Reviews: