PSD-QS (02/16)
Page 8
Figure 2. General Layout of System Components
2) Compressor Unit Placement
EarthLinked
®
compressor units may be located inside or outside. If outside, place
compressor unit on a standard HVAC outdoor unit pad. If inside, place it on a level, hard
surface. If the compressor unit is to be fastened down, see Figure 3 for bracket
installation.
Avoid placing the compressor unit in or near the living area of the residence.
Attic installations must include a condensate pan with drain, and suspension from rafters
with suspension isolators.
Clearance around the unit for service is illustrated in Figure 4. However, local codes and
applicable regulations take precedence.
PSD Compressor Unit must be placed in an environment in which the surrounding air
temperature does not drop below 40°F.
If the compressor unit or other refrigerant-containing system components are located
indoors, they shall be in a location which (1) is an
unoccupied space,
or (2) is served by
the circulating air system, or (3) provides 280 cu. ft. of open space per nominal ton of rated
system capacity. The
2012 International Mechanical Code
defines residential occupancy
as including permanent provisions for living, sleeping, eating, cooking, and sanitation.
Consult local code authorities to define
unoccupied space
for the specific installation.
Summary of Contents for Prime-025
Page 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Page 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Page 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Page 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Page 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Page 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Page 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Page 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Page 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Page 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Page 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Page 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Page 53: ...PSD QS 02 16 Page 53...
Page 54: ...PSD QS 02 16 Page 54...
Page 55: ...PSD QS 02 16 Page 55...
Page 56: ...PSD QS 02 16 Page 56...
Page 57: ...PSD QS 02 16 Page 57...
Page 58: ...PSD QS 02 16 Page 58...