SCW-410-QS (05/12)
Page 7
Compressor units are shipped from the factory with a low pressure nitrogen holding charge.
Carefully relieve the holding charge when the compressor unit is being prepared to connect
refrigerant system piping.
The compressor unit package contains a service valve kit and an adapter kit.
The two service
valves are to be installed on the earth loop vapor and liquid connections of the compressor
unit,
using the adapters to right-size to the proper earth loop line set.
Installation of the service valves will provide isolation of the earth loop system from the compressor
unit and provide easy access to the refrigerant system.
The service valve configuration provided is illustrated in Figure 4a. The ball valve stem is
accessed by removing the cap. The service port is equipped with a Schrader valve insert.
Figure 4a. Service Valve Orientation
Complete service valve installation instructions are contained in the
Service Valve Kit Installation
Manual
, included with the service valves.
Summary of Contents for SCW R-410A
Page 8: ...SCW 410 QS 05 12 Page 8...
Page 9: ...SCW 410 QS 05 12 Page 9 Figure 5 SCW Connections for R 410A...
Page 10: ...SCW 410 QS 05 12 Page 10 Figure 6 SCW Internal Flow Schematic...
Page 11: ...SCW 410 QS 05 12 Page 11 Figure 7 SCW Piping...
Page 15: ...SCW 410 QS 05 12 Page 15 Figure 10 SCW Electrical Ladder Diagram 230 1 60...
Page 16: ...SCW 410 QS 05 12 Page 16 Figure 11 SCW Electrical Schematic 230 1 60...
Page 17: ...SCW 410 QS 05 12 Page 17 Figure 12 SCW Series 230 3 60 Electrical Ladder Diagram...
Page 18: ...SCW 410 QS 05 12 Page 18 Figure 13 SCW Series 230 3 60 Electrical Schematic...
Page 19: ...SCW 410 QS 05 12 Page 19 Figure 14 Part 1 of 2 SCW Field Wiring Diagram Reference Figure 8...
Page 20: ...SCW 410 QS 05 12 Page 20 Figure 14 Part 2 of 2 SCW Field Wiring Diagram Reference Figure 9...
Page 28: ...SCW 410 QS 05 12 Page 28 Figure 21 Charging and Superheat Adjustment Process...