R2>75mm
R1>35mm
20
m
m
0.7
9"
11mm
0.45"
5
. All the tapped screw holes must have at least 6 threads to allow the screw to be firmly secured into the
tapped holes. For the screw that is needed to secure a heavy load, the tapped holes must have at least 8
threads. After tapping the holes must be deburred and cleaned.
6
. All cables must be fixed, but allow for the maximum machine travel movements. Below are diagrams,
recommending the minium radius that should be used for bending the scale cable.
7
. Grounding / Earthing is very important for the noise immunity, the grounding resistance must be less
than 1.0 ohm.
8
. The horizontal and Vertical alignment measurement are taken at 20mm away from the scale ends as
per following figure shown.
Always Committed to Quality Technology & Innovation
Easson
- C. 3 -
Summary of Contents for ES-12
Page 8: ...1 Basic Fucntions Basic Functions BASIC...
Page 15: ...8 Built in Calculator Calculator...
Page 27: ...20 REF datum memory...
Page 31: ...24 LHOLE tool positioning for the Line Holes...
Page 35: ...28 INCL Inclined angle tool positioning...
Page 40: ...33 PCD tool positioning for Pitch Circle Diameter...
Page 45: ...R R R 38 tool positioning for ARC machining...
Page 63: ...R R R 56 Simplified R function...
Page 73: ...66 Shrinkage Calculation L L X 1 005...
Page 91: ...Parameter Setup B 1 SET UP...