User Manual 200 kVA-1200 kVA UPS
3 Installation
15
3 Installation
3. 1 Installation Preparation
3. 1. 1 Site Preparation
Installation weight and dimensions
Ensure that t that the ground and installation platform can bear the weight of UPS, batteries and battery rack. The
weight of the batteries and battery rack should be calculated according to actual usage. Ensure that the elevator
and other transportation equipment can withstand the weight of UPS and its equipment dimension. The
installation weight and dimension of UPS are shown in Table 3-1.
Table 3-1 Installation weight and dimension of UPS
Capacity
Dimension (W x D x H)
Net weight (full-equipped)
Net weight (standard)
200/250/300 kVA
1350mm×900mm×1950mm
900 kg
880kg
400/500/600 kVA
1950mm×900mm×1950mm
1650 kg
1600 kg
750/900 kVA
3700mm×900mm×1950mm
2350 kg
2300 kg
1000/1200 kVA
4500mm×900mm×1950mm
2990 kg
2950 kg
Installation environment
Do not install UPS in high, low temperature or damp places beyond the technical specifications (see the
section of technical parameters for environmental specifications).
Keep UPS away from water source, heat source and inflammable and explosive articles. Avoid installing
UPS in the environment with direct sunlight, dust, volatile gases, corrosive substances and excessive salt
content. It is forbidden to install UPS in the working environment with metal conductive dust.
The optimal operating temperature of valve controlled sealed lead-acid battery is 20
℃
~ 30
℃
, and it is
possible to reduce the battery service life when the temperature is higher than 30
℃
, and shorten the battery
standby time when the temperature is lower than 20
℃
.
Clearance
The cabinet adopts forced cooling measures to cool internal components. The air inlet is at the front of the cabinet
and the outlet is at the top. To ensure good air circulation, gaps must be reserved between the front and top of each
cabinet. The gaps reserved around the UPS cabinet are shown in Table 3-2. See Table 3-2 and Fig. 3-1 for the
gaps.
Table 3-2 Clearance dimensions
Top of cabinet
Min. 500 mm clearance is left for air circulation at the top of the cabinet
Front of cabinet
At least 1000 mm working space
Rear of cabinet
Not required
Right side of cabinet
Not reserved, 500 mm space recommended
Left side of cabinet
Not required
Summary of Contents for EA990 Super