User Manual 200 kVA-1200 kVA UPS
3 Installation
25
Fig. 3-10 Distribution switch baffle of full equipped 400 kVA/500 kVA/600 kVA
Step 2:
connect the power cable.
1. Remove the cable entry baffles at the top and bottom of the equipment and the front baffle of the wiring cabinet.
The position of the baffles is shown in Fig. 3-11.
Fig. 3-11 Top and bottom cable ery baffle and front baffle of the wiring cabinet
Mains input
Bypass input
Maintenance bypass
Output
Distribution
switch
baffle
Top cable entry baffle
Front baffle of
wiring cabinet
Bottom cable entry
baffle
Summary of Contents for EA990 Super
Page 1: ...200 kVA 1200 kVA ...