PREPARING BEFORE INSTALLATION
A. Cut off all the electrical to ensure the safety
B. Make sure the power and drain tunnel
C. Prepare necessary tools like screwdriver, thread rod, spanner etc.
START INSTALLATION
A. Drill four fixing holes on the ceiling according to the position of install
hole on the machine, then install the expansion screw to fix the thread rod.
B. Install the machine through the four thread rods, and adjust the height
according the space to ensure the machine on horizontal level.
C. Connect the drain tube to make sure no leakage, no block for the
drainage.
Connect the power, please make sure the power supply is 208~240v/60hz
and have overload protection.
— 4—
INSTALLATION GUIDE
TO
P
VIE
W
SID
E
VIE
W