14 Introduction
Unpacking
Thoroughly inspect the equipment and packaging immediately on arrival.
Carefully remove the outer protective shipping wrapper. Inspect the machine for any
damage that may have occurred during transit. If goods are received short or in
damaged condition, it is important that you notify the carrier’s driver before they leave
your company and insist on a notation of the loss or damage across the bill of lading.
Otherwise no claim can be enforced against the transportation company. Please note
that a copy of this document is attached to the outside of every crate.
If concealed loss or damage is discovered, notify your carrier at once and request,
insist
, on an inspection. This is absolutely necessary. A concealed damage report must
be made within ten (10) days of delivery of shipment.
Unless you do this, the carrier will not entertain any claim for loss or damage. The agent
will make an inspection and grant a concealed damage notation. If you give the
transportation company a clear receipt for the goods that have been damaged or lost in
transit, you do so at your own risk and expense.
All claims must be filled within
five
(
5
) months of the delivery date or the carrier will not
accept them.
We are willing to assist you in every reasonable manner to help you collect claims for
loss or damage. However, this willingness on Eastey’s part does not make Eastey or its
parent or related companies responsible for collections or claims or replacement of
equipment damaged or lost in transit.
Loading and Unloading Instructions
Air-Ride suspension and shipping straps are required for transportation of the
combination L-sealer and shrink tunnel.
When transporting the combo unit, roll the machine into the truck or trailer, and
then when the machine is in position for shipping, lock the locking casters.
Use shipping straps to restrain the combo unit securely so it will not shift in transit.
Summary of Contents for Combination EC Series
Page 2: ......
Page 4: ......
Page 73: ...Appendix A Electrical Schematic 73 Electrical Schematic L Sealer ...
Page 81: ......