16 Installation and Setup
CAUTION!
Only lift the tape cartridge by the lift points. Lift leading with
the rear lift point first. Take care to keep away from any
cutting edges.
Prepare the Tape Roll
Push the tape roll onto the tape core assembly.
NOTE: Make sure the tape roll is pushed all the way on the tape core
assembly.
Lift Point —
Lift this end
after lifting
other end out.
Lift Point —
Lift this
end first!
Tape Roll
Tape Core
Spindle
Summary of Contents for SB-2 HD
Page 1: ...SB 2 HD Side Belt Heavy Duty Industrial Case Taping System User Guide ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 44: ......