Section 1: Installing the New WASH RACK
[1] De-energize the PROCESSOR or MULTILOADER.
[2] Move the main wall CIRCUIT BREAKER to “OFF”.
[3] For the 180 LP and 270 RA PROCESSORS only:
• Lift the TOP COVER.
• Remove the WET SECTION COVER.
• Remove the EVAPORATION COVERS.
[4] For the MULTILOADER 300 only:
• Extend the PROCESSOR from the MULTILOADER.
• Remove the WET SECTION COVER.
• Remove the EVAPORATION COVERS.
Figure 1
New WASH RACK
B
A
A
A
A
A
A
H127_0217DA
Summary of Contents for 3059
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 69: ...MODIFICATION INSTRUCTIONS TYPE1 10 29JUN96 8B6658 ...