Display
Day 30
Day 03
Day 02
Day 01
Bat + ____KWH
Bat - ____KWH
PVE ____KWH
DPE ____KWH
GDE ____KWH
DISABLE
ENABLE
DISABLE
ENABLE
DISABLE
ENABLE
SMART
PCU
HYBRID
NLSD
Grid
Charger
IT
Mode
Operation
Mode
Set
Time
Select
Reset
Factory
Setting
No. Of Battery (1 - 20)
Grid Chr. Volt. (13.0 - 14.5)
Grid Chg. Current (3A - 12A)
PV Chg. Volt. (13.5 - 15)
PV Chg. Current (5.0 - 22.0)
Batt. Low S.D (10.0 - 11.7)
Batt. High S.D (15.0 - 16.0)
High Cut Volt. (245 - 280)
Low Cut Volt. (120 - 200)
O/P Control Volt. (220/230/240)
O/P High Volt. (250 - 260)
O/P Low Volt. (170 - 190)
Grid Reconnect Volt.
(11.0 - 12.0 Batt. Volt.)
Reset All The Set Values to
Default Values
Reset All
Setting
Inv. output
setting
Set voltage as per
suitable season
Freedom to connect
any kind of batteries
Choose When
to Cut Solar
Reset
All
Grid
Reconnect
Inv.
Output
Grid
Battery
Control
Calibration
Password
10 : 01 : 50
View
Log
Press
Battery
57.9V
+0.0A
-1.0A
15:31:50
Dischg
0.9KWH
0.5KWH
Output
220V
15:31:50
50Hz
0.0A
100W
0.9KWH
Solar
140V
15:31:50
0.0A
0.0W
0.8 KWH
Grid
220V
15:31:50
50Hz
0.0A
0.0W
1.9KWH
Status
15:31:50
GRD Charge of - Mains_L
Inverter off
Sol Charge off - PV Lo
E. How To Configure
PV Reading Reset
Inv. Reading Reset
Batt. Reading Reset
Grid Reading Reset
Clear all logs
All setting will set to
default value
SOLAR OFF-GRID MPPT PCU, PAGE 08, Ver. 1.0
Setting
PCU
User
Setting