12
Form E-551
Replacing the Guide Bushing
1.
Install the new guide bushing into the hole of the drill pressure foot.
2.
Since the guide bushing has (4) different size holes align the correct size hole which matches the drill
rod.
3.
Rotate the guide bushing until the drill rod is aligned with the hole of the drill chuck.
4.
Tighten the set screw on the drill pressure foot and ensure that the drill rod is aligned with the hole in the
guide bushing.
5.
Tighten the drill chuck after the drill rod is aligned and inserted correctly.