13
Control board Charger board
Battery group
Operation
16 units batteries
A. Remove the short pin(J16) off the control board;
B. Insert the short pin(middle of CN7) of the charger board.
20 units batteries
A. Remove the short pin(middle of CN7) of the charger board;
B. Insert the short pin(J16) of the control board.
Note: for long-run type UPS, there are two chargers, users have to operate two charger board.
4. Panel function and operation
The operation is simple, operators only need to read the manual and follow the operation instructions listed in
this manual without any special training.
4.1 Keys function
※
ON K E Y (
+
)
Press and hold the two keys for more than half a second to turn on the UPS.
※
OFF K E Y (
+
)
Press and hold the two keys for more than half a second to turn off the UPS.
※ TEST/MUTE K E Y (
+
)
Short pin
Short pin