background image

Data Power Solutions Quick Start Guide 

 

 

Copyright © 2006-2009 Eaton Corporation.  All Rights Reserved. 

10640205    February 2009 

19

Step 5 – Arrange sleeves and tighten clamp screws 

 

Arrange the sleeves so that they are all within 10mm (3/8”) of the terminals. 

 

Tighten all cable clamp screws. Required torque: 1.5 – 2Nm (13.2 – 17.7 lb-in). 

‡

 

Tighten the screws of any unused clamps to prevent access to the dc output terminations. 

 

Installing the External Batteries (if applicable) 

This section applies to APS3-059, APS3-061 and APS6-059 dc power systems only. 

One 48V battery string can be connected to APS3-059 and APS3-061, and up to three 48V 
battery strings to APS6-059 dc power systems. A 48V battery string consists of either 24 Valve 
Regulated Lead Acid (VRLA) 2 V cells or four VRLA 12 V monoblocs. 

Because of the wide range of battery types and sizes available, we do not supply batteries 
with the above mentioned power systems and therefore do not cover battery installation in 
this guide. Always install batteries according to the relevant battery manufacturer’s 
instructions. 

 

Battery Sizing 

Battery manufacturers provide various types of information for sizing batteries such as 
constant current discharge and constant power discharge data. Your battery supplier will be 
able to assist you with sizing the battery for your application. Before a battery can be sized, 
the following information is required. 

Required backup time, minimum cell voltage (typically 1.83V/cell), load power & operating 
temperature 

In data applications most loads are constant power for a specified backup time. Therefore, for 
sizing a battery for the required backup time, constant power discharge data should be used. 

Batteries for use in North America must be a UL recognized type, category BAZR2. 

 

Battery Location 

Valve Regulated Lead Acid (VRLA) batteries emit very small amounts of hydrogen gas into 
the surrounding atmosphere under normal float charging conditions. For that reason 
batteries should never be installed in a sealed enclosure or cabinet. Install the batteries in a 
well-ventilated location to prevent accumulation of hydrogen gas to flammable or explosive 
levels. 

Building air conditioning and ventilation systems already in place for optimum equipment 
operation and comfort of personnel usually meet or exceed VRLA battery ventilation 
requirements. For specific battery ventilation requirements, always refer to the battery 
manufacturer’s installation instructions. Avoid: 

 

Installing the batteries next to any heating source or under air ducts. 

 

Exposing part of a battery string to direct sunlight. 

 

Any other locations that would cause temperature variations within the batteries. 

 

Summary of Contents for 10640205

Page 1: ...bruary 2009 This guide is intended to be used in conjunction with the full Install and Operation manual IPN 997 00012 41 available from the documentation pages of the web site www powerware com 3com E...

Page 2: ...presentation or guarantee is expressed or implied Information contained in this document is subject to change without further notice Subject to the right to use its equipment Eaton Corporation does no...

Page 3: ...13 Inspecting the Equipment and Reporting Damage 14 Installation 14 Mounting the APS DC Power System 14 Connecting the DC Load Cables 16 Installing the External Batteries if applicable 19 Connecting t...

Page 4: ...this manual or the install and operation manual on the web site then please contact your local sales office who will provide assistance and translation Si certaines sections du pr sent manuel ou du ma...

Page 5: ...or 240V the power systems are equipped with either APU48 or APR48 rectifiers Fused ac sockets one per rectifier are available for connecting the power system to the ac supply Output Eight floating dc...

Page 6: ...pliance Inputs Desktop Versions Pluggable Type A Except for 120V input if APS3 06X power systems are fitted with three rectifiers then only two ac power cords may be connected to one building branch c...

Page 7: ...Start Guide Copyright 2006 2009 Eaton Corporation All Rights Reserved 10640205 February 2009 7 A APS3 06X 120V 1 5mA RCD 1 mm2 3 K1 K3 APS3 K1 K6 APS6 FS1 FS2 15 A 250 VAC 6 3 x 32 mm Bussman ABC 15 L...

Page 8: ...rotection continue contre les risques d incendie n utilisez que des fusibles action rapide de 15 A 250 V CA 6 3 x 32 mm de m me type Bussman ABC 15 ou Littelfuse 314 015 Type 3AB Wechselspannungs Eing...

Page 9: ...alimentaci n CA se podr n conectar a un circuito derivado del edificio El tercer cable CA deber conectarse a un circuito derivado diferente del edificio Si no lo hace se anular n las aprobaciones de s...

Page 10: ...y supplier Do not remove the factory fitted transit insulation covers from the batteries until access to the battery terminals is required Do not place tools loose cables or metal objects such as inte...

Page 11: ...auseinandergebaut werden Senden Sie diese zwecks Ersatz oder Reparatur in der Originalverpackung mit dem ausgef llten Fehlerbericht an Ihren zust ndigen Eaton Produktvertreter Raddrizzatori Per ridur...

Page 12: ...ipment room Both options require regular cleaning of the air filters Do not allow water or any foreign object to enter the APS dc power system Do not place objects containing liquid on top of or near...

Page 13: ...e la unidad como se indica a continuaci n Desconecte los cables CA de los enchufes CA Desconecte las bater as externas apagando los interruptores de circuito de la bater a EMC Compliance APS dc power...

Page 14: ...6 05X series dc power systems may be mounted in 19 inch wide host equipment racks enclosed or open type securely bolted to the floor Desktop Versions APS3 06X series dc power systems may be positioned...

Page 15: ...liert wird darf die Umgebungstemperatur 40 C nicht bersteigen Sorgen Sie f r ungehinderte Luftzirkulation Das Gewicht des Ger ts muss gleichm ig gelagert und abgest tzt sein Beachten Sie den maximalen...

Page 16: ...t colors as specified by local wiring regulations The same applies to battery cables if applicable To reduce inductive coupling separate dc load battery and communications cabling from ac supply cable...

Page 17: ...of an APS dc power system might cause damage to your equipment Such damage is not covered by our warranty Ensure that the correct cable sizes have bee used 18AWG for 6A outlets and 12AWG for 25A outl...

Page 18: ...ll ensure that cables are retained correctly in their clamps Feed the cables through the clamps as follows depending on cable size 1mm2 18 AWG 2 cable pairs per clamp 2 x 5mm sleeves 10mm sleeve If on...

Page 19: ...Your battery supplier will be able to assist you with sizing the battery for your application Before a battery can be sized the following information is required Required backup time minimum cell vol...

Page 20: ...e potential fault current of the battery string The battery circuit breaker s of the power system can not be considered as the fault protection device for the battery string s and associated wiring Th...

Page 21: ...atteriestrangs platzieren muss den potenziellen Fehlerstrom des Batteriestrangs unterbrechen k nnen Die Batterieschutzschalter der Stromversorgungsanlage k nnen nicht als Schutzvorrichtung f r die Bat...

Page 22: ...s con una capacidad nominal inferior deber seleccionar bater as con una impedancia interna adecuada Connecting the Battery Cables if applicable This section applies to APS3 059 APS3 061 and APS6 059 d...

Page 23: ...stem will cause damage to the rectifier modules Such damage will not be covered by the warranty 16mm battery cable sleeve Battery cable clamp with posts removed Step 4 Arrange sleeve and clamp the bat...

Page 24: ...tery temperature sensor is designed to measure the average ambient temperature around the batteries It is important to mount the battery temperature sensor at a location that truly reflects the averag...

Page 25: ...supply at this stage Step 1 Unpack the rectifiers and inspect them carefully for possible damage that may have occurred in transit Report any damage immediately using a completed Equipment Incident Re...

Page 26: ...n be configured from the front panel For entering and editing of all other configuration parameters such as mapping of alarms to relays and setting up communications a laptop computer and the latest v...

Page 27: ...3 061 In the field it is not possible for a service engineer to change output circuit breakers on desktop variants APS3 060 or APS6 061 Battery Input Circuit Breakers In the field it is not possible f...

Page 28: ...he Rated Input Current values and local wiring regulations Connector 1 AC supply Refer to the Rated Input Current values according to AC voltage Connector 2 Data Power Solution IEC type C 13 Frequency...

Page 29: ...280mm 11 Additional clear air space is required at rear for rectifier exhaust air venting Weight APS3 6kg 13 lb APS6 10kg 22 lb Access Power Rectifier 1 9kg 4 2 lb Typical configuration excluding rec...

Reviews: