Step 5
Step 6
JACKET
SEAL
CLEAN
AND
LUBRICATE
CABLE
ENTRANCE
COVER
TEST
POINT
WITH CAP
ATTACH DRAIN
WIRE TO ELBOW
DRAIN WIRE TAB
CLEAN AND
LUBRICATE
ARC
FOLLOWER
Step 7
Elbow and loadbreak probe installation
Step 6
Clean insulation with a lint free cloth saturated with a
cleaning solution. Wipe insulation toward insulation shield.
Apply a thin coating of supplied silicone lubricant to the
insulation.
Clean and lubricate the cable entrance of the elbow.
Place elbow on cable. With a twisting motion, push elbow
onto cable until threaded eye of coppertop connector is
aligned with the elbow.
Step 7
By hand, thread loadbreak probe into threaded eye of
coppertop connector.
When tight, use the provided installation tool to properly
torque the loadbreak probe. Proper torque is applied when
the tool achieves a 180° permanent set.
ote:
N
If a different installation tool is used it must apply
a torque of 100 to 120 in-lb (11.0-13.5 Nm).
Clean and lubricate bushing and elbow interface areas with
a thin even coating of the silicone lubricant provided.
Attach a drain wire lead to the drain wire eye of the elbow.
To aid in the installation of the elbow onto the bushing,
lightly lubricate the white arc follower on the end of the
probe with a thin even coating of the silicone lubricant
provided.
4
200 A 35 KV CLASS “LE” SERIES ELBOW INSTALLATION INSTRUCTIONS
MN650010EN May 2015