background image

 

IOM 570 06/2011

  

                                          REV A. 

 

Page 4 of 8 

E

aton Hydraulics LLC, Filtration Division, 44 Apple Street, Tinton Falls, NJ 07724, www.eaton.com/filtration, Phone 732-212-4700

 

Installation, Operation & Maintenance Manual 

Model 570 Duplex Basket Strainer

 

 

SWITCHING

 

FLOW

 

 

1.

 

Open vent on inoperative chamber. Open pressure 
equalizer valve.        

 
2.

 

Close vent on inoperative chamber when air is expelled 
and fluid begins to flow. 

 
3.

 

Transfer valve discs by turning hand wheels. Both hand 
wheels must be turned simultaneously, clockwise to put 
the far basket chamber in operation, counterclockwise to 
put the near chamber in operation. The unit is equipped 
with a chain drive, so it is necessary to operate one hand 
wheel only. However, final seating and initial unseating 
should be done independently with each hand wheel. The 
reason being that the chain drive mechanism always has 
some “slack.” 

 
4.

 

Close pressure equalizer valve. 

 

BASKET

 

REMOVAL 

 

1.

 

Switch flow from dirty to clean chamber (see Switching 
Flow).  

 
2.

 

Open vent on dirty chamber to relieve liquid pressure. 

 
3.

 

 After air and water flow from vent stops, remove cover 
nuts and body cover and drain fluid through bottom drain 
to a lever below the basket seat. 

 
4.

 

Remove dirty baskets and clean or exchange them. 

 

BASKET

 

REPLACEMENT 

1.

 

Place new or clean basket squarely on basket seat. 
 

2.

 

Be sure basket handle is sufficiently high to be compressed 
by body cover. 
 

3.

 

Inspect body cover gasket and seal surface, clean seat or 
replace gasket as necessary. Always keep spare body cover 
gaskets in stock. 
 

4.

 

Replace body cover, tighten fasteners uniformly. If strainer 
is on suction service, fill basket chamber from outside 
source before installing body cover. 
 

5.

 

Make sure vent is open, close drain valve and refill 
chamber. 

 
 

TO

 

REFILL

 

THE

 

CHAMBER

 

WITH

 

EQUALIZER 

1.

 

Open equalizer valve. 
 

2.

 

Close vent when air is expelled and fluid begins to flow. 
 

3.

 

Close equalizer valve. 
 

TO

 

REFILL

 

THE

 

CHAMBER

 

WITHOUT

 

EQUALIZER 

1.

 

Rotate hand wheels 12 to 15 turns to admit fluid to 
chamber. 
 

2.

 

Close vent when air is expelled and fluid begins to flow. 
 

3.

 

Return valve disc to extreme position. Reseat valves 
individually. 
 

BASKET

 

CLEANING 

 

CAUTION: 

To prevent damage to the baskets, 

DO NOT permit strainer pressure differential 
between the inlet and outlet connections to 
exceed 20 PSI. 

 
 

1.

 

Clean baskets when there is a 5 PSI increase in pressure 
across the strainer. 
 

2.

 

During shutdown for a temporary period, drain fluid and 
clean baskets. 

 

 

 

Summary of Contents for 570

Page 1: ...N A duplex strainer is a device installed in a pipeline to remove dirt and other unwanted debris from fluids Straining is accomplished by directing the fluid through sized openings in a basket Duplex strainers are installed where fluid flow cannot be interrupted while the basket is removed for cleaning Duplex strainers are designed to withstand the rated pressure of the piping system For additiona...

Page 2: ...ft eye is used to lift ONLY the cover 1 Position the strainer in the line so that the fluid enters the connection marked inlet and be sure sufficient headroom is provided for easy removal of cover and baskets 2 Support the strainer in the line as follows Using the bosses on the bottom of the strainer place the unit on concrete or steel pads DO NOT support the strainer or the piping coming to and f...

Page 3: ... pressure equalizer valve 4 Slowly introduce fluid to be strained CAUTION Start system GRADUALLY This eliminates sudden shock to strainer and other equipment in the line CAUTION Recheck Operation procedure to ensure that both valve discs are sealing the same chamber There should be NO SIGNIFICANT AMOUNT OF FLOW from vent in chamber that is isolated NOTE The valve discs or gates are not designed or...

Page 4: ...d drain fluid through bottom drain to a lever below the basket seat 4 Remove dirty baskets and clean or exchange them BASKET REPLACEMENT 1 Place new or clean basket squarely on basket seat 2 Be sure basket handle is sufficiently high to be compressed by body cover 3 Inspect body cover gasket and seal surface clean seat or replace gasket as necessary Always keep spare body cover gaskets in stock 4 ...

Page 5: ... after inlet and outlet pipeline valves are closed both cover vents are open and there is no flow of air or fluid through the vents Location of Leak Correction Spindle mounting header joint Replace spindle mounting 0 ring and or spindle mounting gasket Spindle mounting sight holes Replace O ring on O ring nut Excessive leakage past the valve discs Replace valve seat Repair or replace valve disc HO...

Page 6: ... REV A Page 6 of 8 Eaton Hydraulics LLC Filtration Division 44 Apple Street Tinton Falls NJ 07724 www eaton com filtration Phone 732 212 4700 Installation Operation Maintenance Manual Model 570 Duplex Basket Strainer ...

Page 7: ...ion 2 Short Basket 2 Long Basket 2 Header Cover Gasket 3 Body Cover Gasket 8 O ring 4 O ring Spindle Mounting 2 Snap Ring 2 Basket Flange Gasket Mesh lined baskets only When ordering spare parts be sure to specify all nameplate data as well as description and quantity of parts Always use genuine Eaton replacement parts for guaranteed fit and performance Visit our web site www eaton com filtration ...

Page 8: ... 49 2486 809 0 Fax 49 2486 809 800 Eaton China No 3 Lane 280 Linhong Road Changning District 200335 Shanghai P R China Voice 86 21 5200 0099 Fax 86 21 5200 0400 WARRANTY All products manufactured by Seller are warranted against defects in material and workmanship under normal use and service for which such products were designed for a period of eighteen 18 months after shipment from our factory or...

Reviews: