Page 14
5P 750VA-1. 5 KVA US_EN
3. 3 Rack installation
Follow steps 14 to 16 for model mounting on the rails.
Use provided screws on step 15 of installation. Using a longer screw could present a safety risk.
The rails and necessary hardware are supplied by EATON.
③
⑮
⑭
⑮
⑯
⑯