background image

Page 4 

5P 750VA-1. 5 KVA US_EN

 

 

 

 

1.  Introduction 

 

Thank you f or select ing an EATON product  t o prot ect  your elect rical equipment .

 

 

The 5P range has been designed wit h t he ut most  care.

 

We recommend t hat  you t ake t he t ime t o read t his manual t o t ake f ull advant age of  t he many f eat ures of  your 
UPS (Unint errupt ible Power Syst em).

 

 

Bef ore inst alling your 5P,  please read t he booklet  present ing t he saf et y inst ruct ions.  Then 
f ollow t he indicat ions in t his manual.

 

 

To discover t he ent ire range of  EATON product s and t he opt ions avail able f or t he 5P range,  we invit e you t o visit  our 
web sit e at  www. eat on. com/ powerqualit y or cont act  your EATON represent at ive.

 

 

1. 1 Environmental protection 

 

EATON has implement ed an environment al-prot ect ion policy.  Product s 
are developed according t o an eco-design approach.

 

 

 

Substances

 

 

This product  does not  cont ain CFCs,  HCFCs or asbest os.

 

 

 

Packing

 

 

To improve wast e t reat ment  and f acilit at e recycling,  separat e t he various packing component s.

 

•    The cardboard we use comprises over 50% of  recycled cardboard.

 

•    Sacks and bags are made of  polyet hylene.

 

•   Packing mat erials are recyclable and bear t he appropriat e ident if icat ion symbol   

01

 

PET

 

 

Materials

 

Abbreviations

 

Number in 

01

 

the symbols 

PET

 

Polyet hylene t erepht halat e

 

PET

 

01

 

High-densit y polyet hylene

 

HDPE

 

02

 

Polyvinyl chloride

 

PVC

 

03

 

Low-densit y polyet hylene

 

LDPE

 

04

 

Polypropylene

 

PP

 

05

 

Polyst yrene

 

PS

 

06

 

 

Follow al l local regulat ions f or t he disposal of  packing mat erials.

 

 

 

End of life

 

 

EATON will process product s at  t he end of  t heir service lif e in compliance wit h local regulat ions.  EATON 
works wit h companies in char ge of  collect ing and eliminat ing our product s at  t he end of  t heir service lif e.

 

 

 

Product

 

 

The product  is made up of  recyclable mat erial s.

 

Dismant l ing and dest ruct ion must  t ake place in compliance wit h all local regulat ions concerning wast e.  At  t he end 
of  it s service lif e,  t he product  must  be t ransport ed t o a processing cent er f or elect rical and elect ronic wast e.

 

 

 

Battery

 

 

The product  cont ains lead-acid bat t eries t hat  must  be processed according t o applicable local regulat ions 
concerning bat t eries.

 

The bat t ery may be removed t o comply wit h regulat ions and in view of  correct  disposa

Summary of Contents for 5P750RC

Page 1: ...Page 1 ENGISH Copyright 2015 EATON All right s reserved 5P 750VA 1 5 KVA EU_EN Installation and user manual 5P750RC 5P1000RC 5P1500RC...

Page 2: ...l CISPR 22 EN 55022 Harmonics emission IEC 61000 3 2 Flickers emission IEC 61000 3 3 FCC 47 CFR Part 15 Subpart B Unint ent ional Radiat ors Class B Special symbols The following are examples of symbo...

Page 3: ...nd be easily accessible The syst em can be disconnect ed from t he AC power source by unplugging t he input cable Check t hat t he indicat ions on t he rat ing plat e correspond t o your AC powered sy...

Page 4: ...Battery module connection 13 3 3 Rack installation 14 3 4 Wall mounting of rack model 15 3 5 Communication ports 16 4 Operation 17 4 1 Start up and Normal operation 17 4 2 Starting the UPS on Battery...

Page 5: ...prises over 50 of recycled cardboard Sacks and bags are made of polyet hylene Packing mat erials are recyclable and bear t he appropriat e ident ificat ion symbol 01 PET Materials Abbreviations Number...

Page 6: ...tion 2 1 Standard installations Rack model Description Weights kg lb Dimensions mm inch D xW x H 5P750RC 14 1 31 1 370 440 86 2 14 6 17 3 3 4 5P1000RC 15 0 33 1 370 440 86 2 14 6 17 3 3 4 5P1500RC 18...

Page 7: ...t ional communicat ion card 3 Primary group Out let s for connect ion of crit ical equipment 4 Group 1 programmable out let s for connect ion of equipment 5 Group 2 programmable out let s for connect...

Page 8: ...oad status events measurements and settings 100 19min 1EBM The following t able shows t he indicat or st at us and descript ion Indicator Status Description Green On The UPS is operat ing normally Ora...

Page 9: ...he UPS is powering and protect ing t he equipment In AVR mode 1 beep every 10 seconds The UPS is operat ing normally but t he ut ilit y volt age is out side normal mode t hresholds The UPS is powering...

Page 10: ...he following t able displays t he opt ions t hat can be changed by t he user Submenu Available settings Default settings Local settings Language English Fran ais Deutsch Espa ol Portugu s Italiano Sim...

Page 11: ...ation stays ON 1h30 min after UPS is OFF Disable Remote command Disable Enable If enabled shutdown or restart commands from software are authorised Enable RPO delay 0 s 1s 2 s 180 s Delays remote powe...

Page 12: ...mounting kits 11 Quick start safety instructions and environmental document 12 RS232 communication cable 13 USB communication cable Packing materials must be disposed of in compliance with all local r...

Page 13: ...please connect the internal battery A Remove the center panel B Remove the left hand side of the front panel C Connect the battery module never pull on the wires D Attach the left hand side of the fr...

Page 14: ...N 3 3 Rack installation Follow steps 14 to 16 for model mounting on the rails Use provided screws on step 15 of installation Using a longer screw could present a safety risk The rails and necessary ha...

Page 15: ...Page 15 5P 750VA 1 5 KVA US_EN 3 4 Wall mounting of rack model Use provided screws on step 17 of installation Using a longer screw could present a safety risk...

Page 16: ...r 1 It is not necessary t o shut down t he UPS before inst alling a communicat ion card 1 Remove the slot cover 2 secured by screws 2 Insert the communication card in the slot 3 Secure the card cover...

Page 17: ...See the Cold start setting in ON OFF Settings in section 2 6 To start the UPS on battery 1 Press the button on the UPS front panel until the UPS front panel display illuminates and shows a status of U...

Page 18: ...These functions are obtained by opening a contact connected between the appropriate pins of connector 8 on the rear panel of the UPS see figures below Remote control connection and test 1 Check that t...

Page 19: ...Remove some of the equipment from the UPS The UPS continues to operate but may shutdown if the load increases The alarm resets when the condition becomes inactive End of battery life The end of the ba...

Page 20: ...ls with an insulated handle Mounting the new battery module Carry out the above instructions in reverse order To ensure safety and high performance use only batteries supplied by EATON Take care to fi...

Page 21: ...stem 56 5 to 70 Hz 60 Hz system 2 Output on battery power Voltage 120 V 10 6 3 Frequency 50 60 Hz 0 1 Hz Battery sealed lead acid maintenance free 2 x 12 V 7 2 Ah 2 x 12 V 9 Ah 3 x 12 V 9 Ah Environme...

Page 22: ...low and that the user warning must take action in light of the imminent break in the supply of power to the load Normal AC The AC power line supplying the UPS under normal conditions input Percent lo...

Page 23: ...Page 23 5P 750VA 1 5 KVA US_EN www eaton com Powerquality Eaton 5P...

Reviews: