Page 15
614-03797-00_EN
ENGLISH
3. Installation
3.3 Tower installation
Note:
The two supports for the tower position are used on the RT 2U version only.
3.4 Rack installation
Follow steps 1 to 4 for module mounting on the rails.
1
1
3
4
4
3
2
The rails and necessary hardware are supplied by EATON.