600 A 15/25 kV Class T-OP II connector assembly installation instructions

2

INSTALLATION INSTRUCTIONS

   MN650048EN   May 2017

Installation instructions

Equipment required

T-OP II Connector Assembly Kit including:

T-body

Cable Adapter

Coppertop Compression Connector with 15/16” 

threaded spade

Loadbreak Reducing Tap Plug (LRTP) and copper alloy 

extended length stud 

200 A Loadbreak Protective Cap (when furnished)

Silicone Lubricant

Instruction Sheets

Tools

5/16” Torque Tool (Catalog Number TQHD625)

5/16” T-Wrench (Catalog Number TWRENCH)

Cable preparation

ote:

N

If a non-Eaton Cooper Power series 600 A 

T-body is being used, use the stripback lengths 

given in the T-body kit, then proceed to Step 7 of 

these instructions.

Step 1

Train cable

Position cable so that it is centered between 

apparatus bushing and parking pocket, parallel to 

apparatus frontplate.

Provide adequate cable slack for cable movement 

between standoff bushing and apparatus bushing.

Support cable as needed to maintain position.

EXISTING

BUSHING 

CABLE

1

3

/

4

(45mm) 

Figure 2 .  Line illustration for cable training

Cut cable 1 3/4 inches (45 mm) from centerline of 

bushing. (Refer to Figure 2.)

Step 2

Cutbacks for concentric neutral cable

If cable is not concentric neutral (metallic tape shielded, 

longitudinally corrugated, wire shielded, or UniShield

®

) use 

Eaton’s Cooper Power series SA series adapter kit with 

the same cutback dimensions as concentric neutral below. 

If another manufacturer’s metallic shield adapter is used, 

follow the cutback instructions in the shield adapter kit.

Take care not to cut into the cable insulation.

CONCENTRIC

NEUTRAL WIRES 

CABLE

JACKET

 

VINYL TAPE

MARKER 

EXTRUDED SEMI-CON 

INSULATION SHIELD

CABLE INSULATION

3

/

4

" (248 mm) 

10 

3

/

4

" (273 mm) 

12 

3

/

4

" (324 mm) 

Figure 3 .  Cutback dimensions for concentric neutral cable

Step 3

Install CA625 cable adapter

Cut a 45° chamfer into the end of the cable insulation.

Clean the cable insulation wiping towards the  

semi-con insulation shield.

Apply a thin coating of the supplied lubricant to the cable 

insulation and to the cable entrance of the cable adapter.

Slide cable adapter onto the cable until the black portion 

of the adapter touches the vinyl tape marker.

CABLE INSULATION

CLEAN AND LUBRICATE 

TAPE MARKER

CHAMFER

CA625

{

Figure 4 .  Install the cable adapter

Step 4

Cable insulation cutback

There should be between 4 3/8” and 4 11/16” of exposed 

cable beyond the cable adapter. Cut the cable insulation 

even with the end of the cable adapter and remove the 

protruding cable insulation. Take care not to cut the cable 

adapter or nick the conductor.

Summary of Contents for 600 A 15 kV class T-OP II

Page 1: ...600 A 15 25 kV class T OP II connector assembly installation instructions COOPER POWER SERIES Deadbreak Apparatus Connectors MN650048EN Effective May 2017 Supersedes April 2008 S600 12 3...

Page 2: ...POSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL N...

Page 3: ...III SAFETY INFORMATION III Safety instructions iii PRODUCT INFORMATION 1 Introduction 1 Read this manual first 1 Additional information 1 Acceptance and initial inspection 1 Handling and storage 1 St...

Page 4: ...lines and equipment and support our Safety For Life mission Safety information DANGER Hazardous voltage Contact with high voltage will cause death or severe personal injury Follow all locally approve...

Page 5: ...eak Connectors are used to terminate high voltage underground cable on deadfront apparatus such as transformers switches and switchgear They are fully shielded submersible and meet the requirements of...

Page 6: ...al cable If cable is not concentric neutral metallic tape shielded longitudinally corrugated wire shielded or UniShield use Eaton s Cooper Power series SA series adapter kit with the same cutback dime...

Page 7: ...ust be between 6 1 2 and 7 1 4 CA625 PLACE FIRST CRIMP HERE COMPRESSION CONNECTOR 61 2 71 4 165 mm 184 mm CHECK DIMENSION AFTER CRIMPING Figure 6 Install compression connector Step 6 Install DT625 T B...

Page 8: ...ng stud installation Step 9 Install the T OP II assembly on the apparatus bushing Clean and lubricate mating interfaces of the apparatus bushing and T body with the lubricant supplied Push the T OP II...

Page 9: ...ure 12 Line illustration of protective cap installation Step 11 Ground system Refer to figure 13 Connect tie off tabs of LRTP and T body with an uninsulated drain wire to cable concentric neutral wire...

Page 10: ...600 A 15 25 kV Class T OP II connector assembly installation instructions 6 INSTALLATION INSTRUCTIONS MN650048EN May 2017 This page intentionally left blank...

Page 11: ...600 A 15 25 kV Class T OP II connector assembly installation instructions 7 INSTALLATION INSTRUCTIONS MN650048EN May 2017 This page intentionally left blank...

Page 12: ...nited States Eaton com cooperpowerseries 2017 Eaton All Rights Reserved Printed in USA Publication No MN650048EN May 2017 Eaton is a registered trademark All trademarks are property of their respectiv...

Reviews: