600 A 15/25 kV Class T-OP II connector assembly installation instructions
5
INSTALLATION INSTRUCTIONS
MN650048EN May 2017
200 A
PROTECTIVE
CAP
LRTP 200 A
INTERFACE
T-OP II
ASSEMBLY
CLEAN
AND
LUBRICATE
Figure 12 . Line illustration of protective cap installation
Step 11
Ground system. (Refer to figure 13.)
●
●
Connect tie-off tabs of LRTP and T-body with an
uninsulated drain wire to cable concentric neutral wires
and/or to common ground point.
●
●
Connect 200 A apparatus (i.e., protective cap, grounding
elbow, M.O.V.E. arrester) drain wire to common ground.
T-OP II ASSEMBLY
DRAIN
WIRE
Figure 13 . Line illustration of grounding