600 A T-OP II™ terminator operation instructions
5
Operation Instructions
MN650047EN May 2017
Figure 14 . Reinstall 200 a protective cap
●
●
Repeat this procedure for all cables on both ends, that
were previously grounded.
●
●
Remove all tools, grounds, and personal protective
equipment from work area before re-energizing
equipment.