Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05

C

Chhaapptteerr 44 EEaattoonn 99339955,, 99339955P

P aanndd 99339955X

XC

C FFoouunnddaattiioonn P

Pllaann aanndd M

Moouunnttiinngg R

Reeqquuiirreem

meennttss

Proper mounting of the equipment is the single most important factor in withstandi ng a seismic event. The
foundation must be level and continuous under the entire assembly. The foundation must be designed to
withstand the reaction loads imposed on it by the equipment during a seismic event. At a minimum, the
foundation must be designed to accommodate the tensile strength of the hardware indicated in

Table 7

.

The anchoring system should be put in place prior to equipment installation to reduce effort associated with
anchoring. Welding to embedded steel members is acceptable provided the strength of the welds is
comparable to the mounting bolts.

The user is responsible for compliance with all local seismic codes.

N

NO

OT

TE

E

Anchoring hardware is not provided with Eaton seismic mounting kits because the type
of hardware is dependant on the foundation construction and composition.

Table 7. 9395/P/XC Unit and Fastener Requirements from Unit to Floor

Product

Type

Bolt Type and Size

Torque

Quantity

9395

275 kVA UPS

Class 8.8, M12

83 Nm

61 lb-ft.

8

275 kVA UPS and FI-UPM

12

550 kVA UPS

8

550 kVA UPS and FI-UPM

14

825 kVA UPS

16

825 kVA UPS (2X-UPM)

14

825 kVA UPS (2X-UPM and FI-UPM)

20

1100 kVA or 825 kVA and FI-UPM

22

225-550 kVA MBM

8

275 kVA UPS and MBM

12

550 kVA UPS and MBM

14

9395P

300 kVA UPS

Class 8.8, M12

83 Nm

61 lb-ft.

8

300 kVA UPS and FI-UPM

12

300 kVA UPS (2X-UPM)

14

600 kVA UPS

8

600 kVA UPS and FI-UPM

14

600 kVA UPS (2X-UPM)

12

600 kVA UPS (FL-UPM and 2X-UPM)

12

900 kVA UPS (FL-UPM and 2X-UPM)

14

900 kVA UPS (FL-UPM and 3X-UPM)

14

900 kVA UPS (2X-UPM)

14

Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements

Summary of Contents for 9 55 Series

Page 1: ...p n 164000050 Revision 05 Eaton 9x55 UPS Eaton 9390 UPS Eaton 9395 9395P and 9395XC UPS Eaton 93PM 480V and 93PM L 208V UPS Seismic Data Requirements for Eaton UPS Equipment Installation...

Page 2: ...d trademark of Kirk Key Interlock company LLC a subsidiary of Halma plc National Electrical Code and NEC are registered trademarks of National Fire Protection Association Inc ERIFLEX and FLEXIBAR are...

Page 3: ...me en nt ts s 6 6 3 1 Displacement 6 3 2 Center of Gravity 7 3 3 Power Cables 7 3 4 9390 Floor Plan Securing Dimensions 7 4 4 E Ea at to on n 9 93 39 95 5 9 93 39 95 5P P a an nd d 9 93 39 95 5X XC C...

Page 4: ...18 9395 MBM Seismic Mounting Dimensions 21 Figure 19 9395 MBM and 275 kVA UPS Seismic Mounting Dimensions 22 Figure 20 9395 MBM and 550 kVA UPS Seismic Mounting Dimensions 22 Figure 21 9395XC 1500 kW...

Page 5: ...PM IBC L and IBC LH Seismic Mounting Dimensions 47 Figure 42 93PM IBC L and IBC LH with Sidecar Seismic Mounting Dimensions 48 Figure 43 93PM IBC LW and IBC LHW Seismic Mounting Dimensions 49 Figure 4...

Page 6: ...tener Requirements from Unit to Floor 6 Table 5 9390 Unit Seismic Displacement Requirements 6 Table 6 9390 Unit Center of Gravity Specifications 7 Table 7 9395 P XC Unit and Fastener Requirements from...

Page 7: ...within the IBC CBC and OSHPD and demonstrated the ability to function after the test All installation guidelines covered in this document as well as the instruction and operations literature provided...

Page 8: ...g hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition Table 1 9x55 Unit and Fastener Requirements from Un...

Page 9: ...ifications Type X left to right Y front to rear Z bottom to top 8 15 kVA UPS 2 High 81 mm 452 mm 406 mm 8 15 kVA UPS 3 High 81 mm 452 mm 610 mm 8 15 kVA EBC 2 and 3 High 81 mm 452 mm 406 mm 2 High 610...

Page 10: ...smic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 Figure 1 9x55 Stackable Unit Seismic Mounting Detail FRONT Eaton 9x55 UPS Foundation Plan and Mounting Require...

Page 11: ...Equipment Installation User s Guide 164000050 Rev 05 5 Figure 2 9x55 20 30 kVA Cabinet Seismic Mounting Detail Installing the Hold Down Brackets Installing the Seismic Gusset Front Eaton 9x55 UPS Fou...

Page 12: ...odes N NO OT TE E Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition Table 4 9390 Unit and Fas...

Page 13: ...nt mounting hole x y z origin Table 6 9390 Unit Center of Gravity Specifications Type X left to right Y front to rear Z bottom to top 20 80 kVA UPS 252 mm 248 mm 940 mm 20 80 kVA UPS w sidecar 393 mm...

Page 14: ...8 Seismic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 Figure 3 9390 80 kVA UPS Seismic Mounting Detail Eaton 9390 Foundation Plan and Mounting Requirements...

Page 15: ...Seismic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 9 Figure 4 9390 160 kVA UPS Seismic Mounting Detail Eaton 9390 Foundation Plan and Mounting Requirements...

Page 16: ...10 Seismic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 Figure 5 9390 20 80 kVA IDC Seismic Mounting Detail Eaton 9390 Foundation Plan and Mounting Requirements...

Page 17: ...Equipment Installation User s Guide 164000050 Rev 05 11 Figure 6 9390 20 80 kVA with Sidecar Seismic Mounting Dimensions Figure 7 9390 100 160 kVA with Sidecar Seismic Mounting Dimensions Eaton 9390 F...

Page 18: ...2 Seismic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 Figure 8 9390 160 kVA IDC Seismic Mounting Dimensions Eaton 9390 Foundation Plan and Mounting Requirement...

Page 19: ...Seismic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 13 Figure 9 9390 80 kVA and 160 kVA IAC B D T Eaton 9390 Foundation Plan and Mounting Requirements...

Page 20: ...s acceptable provided the strength of the welds is comparable to the mounting bolts The user is responsible for compliance with all local seismic codes N NO OT TE E Anchoring hardware is not provided...

Page 21: ...t Type and Size Torque Quantity 9395P continued 900 kVA UPS 3X UPM Class 8 8 M12 83 Nm 61 lb ft 14 1200 kVA UPS 3X UPM 20 1200 kVA UPS 4X UPM 22 9395XC 1500 kW HD UPS Class 8 8 M12 66 Nm 64 lb ft 16 1...

Page 22: ...m 49 mm 225 550 kVA MBM 36 mm 36 mm 275 kVA UPS and MBM 74 mm 49 mm 550 kVA UPS and MBM 39 mm 44 mm 9395P 300 kVA UPS 74 mm 49 mm 300 kVA UPS and FI UPM 74 mm 49 mm 300 kVA UPS 2X UPM 74 mm 49 mm 600...

Page 23: ...1 mm 460 mm 882 mm 1100 kVA or 825 kVA and FI UPM 2388 mm 462 mm 880 mm 225 550 kVA MBM 431 mm 323 mm 966 mm 275 kVA UPS and MBM 1409 mm 412 mm 959 mm 550 kVA UPS and MBM 1768 mm 442 mm 937 mm 9395P 3...

Page 24: ...cables 4 4 4 4 9 93 39 95 5 F Fllo oo or r P Plla an n S Se ec cu ur riin ng g D Diim me en ns siio on ns s Figure 10 through Figure 26 detail the measurements for attaching the 9395 seismic brackets...

Page 25: ...on User s Guide 164000050 Rev 05 19 Figure 12 9395 550 kVA or 9395P 600 kVA UPS Seismic Mounting Dimensions Figure 13 9395 550 kVA or 9395P 600 kVA UPS and FI UPM Seismic Mounting Dimensions Eaton 939...

Page 26: ...Figure 14 9395 825 kVA or 9395P 900 kVA UPS Seismic Mounting Dimensions Figure 15 9395 825 kVA UPS 2X UPM Seismic Mounting Dimensions Figure 16 9395 825 kVA or 9395P 900 kVA UPS 2X UPM and FI UPM Sei...

Page 27: ...stallation User s Guide 164000050 Rev 05 21 Figure 17 9395 1100 kVA UPS or 825 kVA 1 or 9395P 1200 kVA UPS Seismic Mounting Dimensions Figure 18 9395 MBM Seismic Mounting Dimensions Eaton 9395 9395P a...

Page 28: ...ipment Installation User s Guide 164000050 Rev 05 Figure 19 9395 MBM and 275 kVA UPS Seismic Mounting Dimensions Figure 20 9395 MBM and 550 kVA UPS Seismic Mounting Dimensions Eaton 9395 9395P and 939...

Page 29: ...00050 Rev 05 23 Figure 21 9395XC 1500 kW HD UPS Seismic Mounting Dimensions Dimensions are in millimeters inches Figure 22 9395XC 1500 kW LD UPS Seismic Mounting Dimensions Dimensions are in millimete...

Page 30: ...c Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 Figure 23 9395 Seismic Door Securing Hardware Detail Eaton 9395 9395P and 9395XC Foundation Plan and Mounting Req...

Page 31: ...Equipment Installation User s Guide 164000050 Rev 05 25 Figure 24 9395 I O Intercabinet Shim Location and Seismic Floor Bracket Attachment Detail I O Cabinet Right Side Eaton 9395 9395P and 9395XC Fo...

Page 32: ...ata Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 Figure 25 9395 FI UPM Shim Location Detail for Seismic Kit Eaton 9395 9395P and 9395XC Foundation Plan and Mounting...

Page 33: ...Equipment Installation User s Guide 164000050 Rev 05 27 Figure 26 9395 Attachment Detail for FI UPM and I O Module FI UPM Right Side I O Cabinet Right Side Front Front Eaton 9395 9395P and 9395XC Fou...

Page 34: ...rable to the mounting bolts The user is responsible for compliance with all local seismic codes N NO OT TE E Anchoring hardware is not provided with Eaton seismic mounting kits because the type of har...

Page 35: ...us values The equipment must be at the minimum distance listed in the table to avoid contact with other stationary objects during a seismic event Table 11 93PM Unit Seismic Displacement Requirements M...

Page 36: ...viit ty y For seismic calculations the center of gravity can be approximated using the dimensions in Table 12 with respect to the left side bracket s front mounting hole x y z origin Battery cabinet...

Page 37: ...1105 mm UPS 60 kW with Top Entry Left Mounted Sidecar 446 mm 550 mm 1080 mm UPS 60 kW with Top Entry Right Mounted Sidecar 317 mm 550 mm 1080 mm UPS 60 kW with MBS Left Mounted Sidecar 507 mm 552 mm 1...

Page 38: ...07 mm 981 mm 5 5 3 3 P Po ow we er r C Ca ab blle es s It is recommended that power cables be lashed together at least every meter within the equipment Refer to the appropriate Eaton UPS instruction a...

Page 39: ...164000050 Rev 05 33 Figure 27 93PM L UPS 60 and 120 kW 208V 93PM UPS 50 100 and 150 kW Frame 480V Seismic Mounting Dimensions Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT 4EA FRONT REAR...

Page 40: ...Sidecar Dimensions are in millimeters inches UPS with Left Mounted Sidecar UPS with Right Mounted Sidecar NOTE 93PM L 60 kW UPS with Top Entry Sidecar and 93PM UPS 50 100 and 150 kW UPS with Small Sid...

Page 41: ...kW with and 120 kW 208V with Large Sidecar 93PM L with Left Mounted Large Sidecar 93PM L with Right Mounted Large Sidecar Dimensions are in millimeters inches NOTE 93PM L 60 kW and 120 kW UPS floor m...

Page 42: ...Large Sidecar 480V Dimensions are in millimeters inches 12X M12 OR 12X 1 2 BOLT FRONT BACK 12X M12 OR 12X 1 2 BOLT FRONT BACK NOTE 93PM 100 kW and 150 kW UPS floor mounting brackets and locations are...

Page 43: ...tallation User s Guide 164000050 Rev 05 37 Figure 31 93PM L UPS 160 kW 208V Seismic Mounting Dimensions Dimensions are in millimeters inches 12X M12 OR 12X 1 2 BOLT 6EA FRONT REAR Eaton 93PM 480V and...

Page 44: ...Installation User s Guide 164000050 Rev 05 Figure 32 93PM L UPS 200 kW 208V Seismic Mounting Dimensions Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT 4EA FRONT REAR Eaton 93PM 480V and 9...

Page 45: ...stallation User s Guide 164000050 Rev 05 39 Figure 33 93PM UPS 200 kW Frame Seismic Mounting Dimensions 480V Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT FRONT BACK Eaton 93PM 480V and 9...

Page 46: ...PM UPS 200 kW Frame with Sidecar Seismic Mounting Dimensions 480V Dimensions are in millimeters inches 12X M12 OR 12X 1 2 BOLT FRONT BACK 12X M12 OR 12X 1 2 BOLT FRONT BACK UPS with Left Mounted Sidec...

Page 47: ...llation User s Guide 164000050 Rev 05 41 Figure 35 93PM UPS 400 kW Frame Seismic Mounting Dimensions 480V Dimensions are in millimeters inches 16X M12 OR 16X 1 2 BOLT 8EA FRONT REAR Eaton 93PM 480V an...

Page 48: ...stallation User s Guide 164000050 Rev 05 Figure 36 93PM L 208V and 93PM 480V IAC D Seismic Mounting Dimensions Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT FRONT BACK Eaton 93PM 480V and...

Page 49: ...nt Installation User s Guide 164000050 Rev 05 43 Figure 37 93PM 480V IAC T Seismic Mounting Dimensions Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT FRONT BACK Eaton 93PM 480V and 93PM L...

Page 50: ...e 38 93PM L 208V IAC B and 93PM 480 IAC BD Seismic Mounting Dimensions 8X M12 OR 8X 1 2 BOLT FRONT BACK Dimensions are in millimeters inches NOTE 93PM L IAC B and 93PM IAC BD floor mounting brackets a...

Page 51: ...llation User s Guide 164000050 Rev 05 45 Figure 39 93PM L 208V and 93PM 480V IAC PD Seismic Mounting Dimensions 8X M12 OR 8X 1 2 BOLT FRONT BACK Dimensions are in millimeters inches Eaton 93PM 480V an...

Page 52: ...quipment Installation User s Guide 164000050 Rev 05 Figure 40 93PM IBC S Seismic Mounting Dimensions Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT FRONT BACK Eaton 93PM 480V and 93PM L 20...

Page 53: ...Installation User s Guide 164000050 Rev 05 47 Figure 41 93PM IBC L and IBC LH Seismic Mounting Dimensions Dimensions are in millimeters inches 8X M12 OR 8X 1 2 BOLT FRONT BACK Eaton 93PM 480V and 93PM...

Page 54: ...ide 164000050 Rev 05 Figure 42 93PM IBC L and IBC LH with Sidecar Seismic Mounting Dimensions Dimensions are in millimeters inches 12X M12 OR 12X 1 2 BOLT FRONT BACK 12X M12 OR 12X 1 2 BOLT FRONT BACK...

Page 55: ...4 5 1 8 250 9 8 500 19 7 59 5 2 3 705 5 27 8 750 29 5 34 5 1 4 34 5 1 4 12X 14 29 6 REAR FRONT BOTTOM VIEW Dimensions are in millimeters inches 23 9 0 0 1103 43 4 1126 44 3 59 5 2 3 0 0 104 4 1 309 5...

Page 56: ...ations the UPS cabinet floor mounting surface must be level To install the brackets 1 Unload and mechanically install the UPS according to the instructions in the applicable installation and operation...

Page 57: ...Retention Kit Bracket Details NOTE Slots in door bracket allow for horizontal adjustment NOTE Slots in cabinet bracket allow for adjustment in the depth direction Door Bracket Cabinet Bracket N NO OT...

Page 58: ...emove these screws to install the door bracket Top Inside View of Door Install the door bracket and secure with screws previously removed NOTE The interior of the UPS door is identical for the Eaton 9...

Page 59: ...Cabinet Bracket Install Location Holes used to mount the cabinet bracket Holes used to mount the cabinet bracket Eaton 93PM L 208V UPS Eaton 93PM 480V UPS NOTE For clarity the UPS door is not shown NO...

Page 60: ...Bracket Install Details Eaton 93PM L 208V UPS Eaton 93PM 480V UPS Cabinet bracket installed bolts provided in kit Cabinet bracket installed bolts provided in kit NOTE For clarity the UPS door is not s...

Page 61: ...Seismic Data Requirements for Eaton UPS Equipment Installation User s Guide 164000050 Rev 05 55 Eaton 93PM 480V and 93PM L 208V Foundation Plan and Mounting Requirements...

Page 62: ...16400005005 164000050 05...

Reviews: