9.
Slowly roll the cabinet toward
the ramp edge. Be careful not to
push the cabinet too much or
too fast since it may cause the
cabinet to tip over. Note that the
cabinet is heavy. Make sure that
you have enough manpower to
handle and support the unit
while rolling it off the pallet.
10. Roll the cabinet to its final
installation location.
11. To secure the UPS cabinet in
position, lower the leveling feet
until the cabinet is not resting on
the casters and the cabinet is
level.
With the 15/20 kw frame,
reattach the shipping brackets
to the UPS cabinet to provide
extra support. There are 2
options for positioning the
shipping brackets: on both sides
of the unit or on the front and
rear of the unit.
Note: If you remove the cabinet from its original installation location and
transfer it to a new location on a pallet, lower the leveling feet until the cabinet
is not resting on the casters. In addition, attach the shipping brackets to the
cabinet and the pallet.
Eaton 91PS/93PS UPS 8–40 kW
User's and installation guide
©
Eaton Corporation plc 2018. All rights reserved.
Revision: 005
Document ID: P-164000493
54 (117)