Figure 16. Gland plate and connector locations in the 15-20 kW standard and C-model
frames
Figure 17. Gland plate and connector locations in the 30-40 kW frame
1
Connectors
2
Gland plate
1.
To gain access to the terminal
blocks, remove the screws
securing the gland plate at the
back of the UPS.
Eaton 91PS/93PS UPS 8–40 kW
User's and installation guide
©
Eaton Corporation plc 2018. All rights reserved.
Revision: 005
Document ID: P-164000493
56 (117)