Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
19
Figure 9. Unloading the Cabinet
11. With the cabinet supported, slowly pull the pallet away from the cabinet (see
).
Figure 10. Removing the Pallet
12. Roll the cabinet to the desired location.
44..33
EExxtteerrnnaall A
AC
C P
Poow
weerr W
Wiirriinngg IInnssttaallllaattiioonn
You are now ready to install the Eaton 9355 UPS. Select one of the following installation options according to
your UPS configuration:
•
To install the Version 1 Tie Cabinet, see paragraph
Version 1 Tie Cabinet Parallel Installation
•
To install the Version 2 Tie Cabinet, see paragraph
Version 2 Tie Cabinet Parallel Installation
44..33..11
V
Veerrssiioonn 11 TTiiee C
Caabbiinneett P
Paarraalllleell IInnssttaallllaattiioonn
The Eaton 9355 UPS has the following power connections:
•
3–phase (L1, L2, and L3), neutral, and ground connection for rectifier/bypass input
•
3–phase (L1, L2, and L3), neutral, and ground connection for load output
Summary of Contents for 9355 Series
Page 1: ...p n 164201601 Revision E0 10 15 kVA User s Guide Eaton 9355 Parallel UPS ...
Page 4: ......
Page 10: ...x Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 List of Tables ...
Page 18: ...8 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Safety Warnings ...
Page 54: ...44 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 UPS System Installation ...
Page 68: ...58 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Operation ...