Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
39
44..33..44
S
Sttaabbiilliizziinngg tthhee C
Caabbiinneett
NOTE 1
For seismic installations, you MUST order and install an Eaton 9355 UPS seismic kit; do
not use the following instructions.
NOTE 2
For non-seismic installations, you MUST install the stabilizing bracket on all 3-high
cabinets. The stabilizing bracket is optional for 2-high cabinets.
To stabilize the cabinet(s):
1.
Lower the leveling feet to prevent the cabinet from rolling.
Figure 34. Lowering the Leveling Feet
2.
Attach the stabilizing bracket to the bottom of the cabinet rear panel using the retained hardware from the
shipping pallet according to the cabinet configuration:
•
For one cabinet, see
.
•
For two cabinets, see
•
For three cabinets, see
.
NOTE
No more than three cabinets can be attached together. For four cabinets, use two of the
two-cabinet installations. For five cabinets, use one three-cabinet and one two-cabinet
installation.
3.
Use the holes and slots in the bottom of the bracket to attach the cabinet to the flooring if desired.
4.
Continue to one of the following sections:
•
See paragraph
Extended Battery Module Installation
to install optional EBMs.
•
See
to start up the UPS.
NOTE
After UPS startup, ensure maximum battery runtime by configuring the UPS for the
correct number of EBMs (see paragraph
Summary of Contents for 9355 Series
Page 1: ...p n 164201601 Revision E0 10 15 kVA User s Guide Eaton 9355 Parallel UPS ...
Page 4: ......
Page 10: ...x Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 List of Tables ...
Page 18: ...8 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Safety Warnings ...
Page 54: ...44 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 UPS System Installation ...
Page 68: ...58 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Operation ...
Page 72: ...164201601E0 164201601 E0 ...