UPS SYSTEM INSTALLATION
Eaton 9395 UPS (450–825 kVA) Installation and Operation Manual
S
164201725 Rev 4
www.eaton.com/powerquality
4-10
Front View Base Bracket
UPM Section Base
ISBM Section Base
Bracket from Kit
Screw from Kit
Screw from Kit
Top View Rear Bracket
UPM
Section Top
ISBM
Section Top
Screw from Kit
Screw from Kit
Bracket from Kit
Back
Top View Front Bracket
UPM
Section Top
Screw from Kit
Screw from Kit
ISBM
Section Top
Bracket from Kit
Front
Figure 4‐9. ISBM Section to UPM Section Joining Brackets
4.4
Electrically Connecting the Sections
1.
Unfasten the front door latch and swing the door open (see Figure 4‐1 on
page 4-2).
2.
Remove the door. Remove the retaining screw located inside the door at the
bottom hinge pivot point, then lift the door off. Retain the hardware for later use.
3.
Remove the screws securing the ISBM section right bottom internal safety
shield panel and remove the panel to gain access to the internal input, output,
and battery terminals. Retain the hardware for later use.
NOTE
AC and DC input intercabinet power wiring harnesses are supplied coiled and secured in the UPM
wireway on the left side of the UPM section (see Figure 4‐8 on page 4-9).
4.
Locate the AC and DC input intercabinet power wiring harnesses (long cables
labeled xG1, xG2, and xG3). Remove wire ties as necessary and uncoil the
cables.