Chapter 3
Installation Plan and Unpacking
Use the following basic sequence of steps to install the Eaton 93E 30 or 60 Integrated Accessory
Cabinet-Distribution (IAC-D):
1.
Create an installation plan for the IAC-D (Chapter 3).
2.
Prepare your site for the IAC-D (Chapter 3).
3.
Inspect and unpack the IAC-D (Chapter 3).
4.
Unload and install the IAC-D, and wire the system (Chapter 4).
5.
Complete the Installation Checklist (Chapter 4).
6.
Have authorized service personnel perform preliminary operational checks and start up the UPS system.
3.1
Creating an Installation Plan
Before installing the IAC-D, read and understand how this manual applies to the system being installed. Use
the procedures and illustrations in this section to create a logical plan for installing the IAC-D. This section
contains the following information:
l
Physical features and requirements, including dimensions
l
Power wiring installation information
3.2
Preparing the Site
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. If the UPS system is to be operated at an altitude higher than 1000m
(3280 ft), contact an Eaton service representative for important information about high altitude operation. The
operating environment must meet the weight, clearance, and environmental requirements specified for the
applicable accessory cabinet.
3.2.1
Environmental and Installation Considerations
The UPS system installation, including the IAC-D, must meet the following guidelines:
l
The system must be installed on a level floor suitable for computer or electronic equipment.
l
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
The IAC-D operating environment must accommodate the weight requirements shown in Table 3-1 and the
size and space requirements shown in Table 3-2 and Figure 3-1 through Figure 3-6.
NOTE
Startup and operational checks must be performed by an authorized Eaton
Customer Service Engineer, or the warranty terms specified on page W-1 become
void. This service is offered as part of the sales contract for the UPS. Contact an
Eaton service representative in advance (usually a two-week notice is required) to
reserve a preferred startup date.
Summary of Contents for 93E 30IAC-D
Page 2: ......
Page 19: ...Section 1 Installation ...
Page 20: ......
Page 59: ...Section 2 Operation ...
Page 60: ......
Page 75: ......
Page 76: ... P 164000072 2 P 164000072 2 ...