Note: Verify that the forklift is rated to handle the weight of the cabinet.
For transportation purposes, the UPS cabinet is bolted onto a wooden pallet.
Figure 13. UPS cabinet as shipped on pallet (wood container removed)
To remove the pallet, do the following:
1.
Before you unload the cabinet from the pallet, use a forklift or a pallet
jack to move the cabinet to the installation area. Insert the forks of the
forklift between the skids on the bottom of the unit.
2.
Make a visual inspection and check that there are no signs of shipping
damages.
3.
Set the pallet on a firm, level surface, allowing a minimum clearance of 3
m on each side for removing the cabinet from the pallet.