4 UPS installation plan and unpacking
Use the following basic sequence of steps to install the UPS:
1.
Create an installation plan for the UPS system.
2.
Prepare your site for the UPS system.
3.
Inspect and unpack the UPS cabinet.
Note: If the UPS cabinet has suffered damage during the transportation,
do not continue the installation. Contact your local Eaton representatives
for further actions.
4.
Unload and install the UPS cabinet and wire the system.
5.
Install features, accessories, or options, as applicable.
6.
Complete the installation checklist provided in Section
7.
Have authorized service personnel perform the preliminary operational
checks and startup.
Note: Startup and operational checks must be performed by an authorized
Eaton Field Service Engineer or by other qualified service personnel
authorized by Eaton, or the terms specified in the Warranty (see Chapter
)
become void. This service is offered as a part of the sales contract for the
UPS. Contact service in advance (usually a two-week notice is required) to
reserve a preferred startup date.
CAUTION
Make sure that no power source AC or DC can accidentally be connected to
the UPS during installation.
WARNING
Installation may only be carried out by qualified technicians and in conformity
with the applicable safety standards.
The UPS unit is not applicable to the IT (Isolated Terra), TT, or corner
grounded power distribution system.
4.1 Creating an installation plan
Before you install the UPS system, read and understand how these instructions
apply to the system that you are going to install. Use the procedures and
illustrations in Section
to create a logical plan for installing the
system.
Eaton 93E Generation 2 UPS 100-200 kVA
(380/400/415V)
User's and installation guide
©
Eaton Corporation plc 2019. All rights reserved.
Revision: 002
Document ID: P-164000848
31 (118)