UPS Installation Plan and Unpacking
Table 3-3. 93E XL Required Clearances
93E XL Required Clearance for paralleled adjacent UPS or UPS and adjacent PDU
Ambient
L1(mm)
L2(mm)
25
o
C
30
o
C
35
o
C
40
o
C
Notes:
≥
600
≤
50
• L1- clearance to the rear wall.
• L2- clearance between the adjacent paralleled UPS or UPS and adjacent PDU. Parallel UPS should be as close
as possible.
• Some models that feature rear connections also require additional rear clearance to enable installation and
connection.
CAUTION
If battery systems are located in the same room as the UPS, the battery manufacturer's
environmental requirements should be followed if they are more stringent than the UPS
requirements. Operating temperatures above the recommended range will result in decreased
battery life and performance, and may reduce or void the battery warranty.
The UPS ventilation requirements are shown in Table 3-4.
Table 3-4. Air Conditioning or Ventilation Requirements During Full Load Operation
Model
Power
Rating
Input / Output Voltage
Heat Dissipation (KC/H)
93E XL-10I-9AH-MBS
10 kVA
380/380 400/400
415/415
523
93E XL-10I-9AH-MBS
15 kVA
380/380 400/400
415/415
862
93E XL-10I-9AH-MBS
20 kVA
380/380 400/400
415/415
1149
93E XL-10I-9AH-MBS
30 kVA
380/380 400/400
415/415
1723
93E XL-10I-9AH-MBS
40 kVA
380/380 400/400
415/415
2298
9
Eaton 93E XL UPS (10-40kVA, 380/400/415V) Installation and Operation
Summary of Contents for 93E XL
Page 1: ...Eaton 93E XL UPS 10 40 kVA 380 400 415V Installation and Operation Manual ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 49: ...Notes 39 Eaton 93E XL UPS 10 40kVA 380 400 415V Installation and Operation ...
Page 94: ......
Page 95: ......
Page 96: ...614 00389 00 ...